2024 年 3 月 31 日 — CTUIL 和 RE Developers、CEA 主席指示如下:等。 (a) SECI 制定有关弱电销售方式的 SOP。
set aside Transmission Charges bills raised by CTUIL and declaration that the Petitioners stands discharged from performance under, Transmission Service Agreement dated 29.1.2018, LTA Agreement dated 29.1.2018 (Tranche 1), Agreement for Long Term Access dated 6.9.2018 (Tranche 2) and Bipartite Connection Agreement dated 11.1.2019 executed between ReNew Power Pvt.Ltd.和印度有限公司的中央传输公用事业(印度较早的电网公司有限公司)因不可抗力和根据印度太阳能公司(Solar Energy Corporation of India India Ltd)执行的第23.5.2022条的效力和绩效的不可能而获得的绩效。请愿人:更新风能(AP 2)私人有限公司和ANR。受访者:印度有限公司(CTUIL)和2 ORS的中央传输效用。听证会日期:19.4.2024 Coram:Shri Jishnu Barua,主席Shri Arun Goyal,成员Shri P. K. Singh,出席会员的成员党派:Rwpl Shri Girik Bhalla倡导者Shri Vishrov Mukerjee,Rwpl M. priwpl ms. priyanka vyas vyas vyas and secotate and Secote and Secote and Secote倡导者,Seci Shirsa Saraswati女士Surbhi Kapoor女士,倡导者,Seci Seci Poorva Saigal女士,倡导者,HPPC Shri Ravi Nair,倡导者,HPPC Reeha Singh女士,HPPC女士
法规/详细程序,并进行适当的利益相关者协商。因此,为了收集利益相关者(RE 开发商、REIA、RE 协会、CEA 等)对重新分配流程(范围、资格、优先权、责任等)的意见、建议和评论,于 2024 年 2 月 20 日在 CTUIL 办公室召开了一次实体预咨询会议,并分发了议程。议程副本附在附件 I 中。除了 CTUIL 官员外,代表 SECI(REIA)、RE 发电项目开发商、RE 公园开发商、RE 协会等的参与者也参加了会议。参与者名单附在附件 II 中。
4.2(a)在11(i)上修改祈祷,如下:“ i。扩展了其余50MW容量的LTA运营日期,并将其与修订的商业操作的预定日期(即05.12.2022)保持一致; 4.2(b)在11(iv)和11(v)上添加以下祈祷:“ iv。搁置了29.03.2022,04.04.2022,05.05.2022,06.06.06.06.2022,08.07.07.2022和11.08.2022的“供应清单”,并在请愿人/申请人的申请人和“申请书”上提出的申请书上提出的申请书和申请书上提出的申请书和申请书的申请书上提出了申请书,并在申请书中提出了申请。 v。直接直到处置标题请愿书之前,直接对申请人采取任何强制性或降水行动;
由于 Gadag II-A Transmission Ltd. 与印度中央输电公用事业有限公司于 2022 年 11 月 18 日签订的输电服务协议中发生某些不可抗力事件,输电线路/项目调试延迟,因此“卡纳塔克邦 Gadag 太阳能区 (1500 MW) 输电计划:A 部分第二阶段”下输电线路的 SCOD 延长。申请人:Gadag IIA Transmission Limited (GIIATL) 答辩人:印度中央输电公用事业有限公司 (CTUIL) 及其他方。听证日期:2024 年 10 月 7 日 会议成员: Shri Jishnu Barua,主席 Shri Ramesh Babu V.,成员 Shri Harish Dudani,成员 出席各方: Shri Vishrov Mukerjee,律师,GIIATL Shri Swapnil Verma,CTUIL Shri S. Vallinayagam,律师,TANGEDCO 会议记录 请愿人的法律顾问表示,提交本请愿书的主要目的是寻求将 Gadag PS-Koppal PS 400 kV D/c 线路的计划商业运营日期 (SCOD) 从 2024 年 5 月 17 日延长至该线路的实际开始运营日期,因为发生了某些不可抗力事件,即: (i) 根据《2003 年电力法》第 164 条授予批准的延迟,以及 (ii) 由于请愿人在建设该线路时面临严重的通行权 (RoW) 问题而导致的延迟,这种情况一直持续到今天。律师进一步表示,委员会已在之前的命令中将这些事件认定为不可抗力事件。律师表示,由于存在迫在眉睫的威胁,即 CTUIL 可能会因该线路的调试延迟而兑现请愿人根据输电服务协议提交的履约银行担保 (PBG),请愿人正在祈求对 CTUIL 发出临时指示,在请愿书最终处理完毕之前不要兑现 PBG。律师指出,随着 400 kV Gadag PS-Narendra(新)D/c 线路和 2×500 MVA、400/220 kV Gagad PS 在 Gadag 一期工程于 2024 年 9 月 4 日投入使用,以及 Gadag 二期 PS 和相关线路舱的准备就绪,可再生能源的输送将不再存在瓶颈。2. 被告 CTUIL 的代表和被告 TANGEDCO 的律师请求给予时间就此事提交各自的答复。3. 考虑到律师和当事人代表的意见,委员会指示如下:
set aside Transmission Charges bills raised by CTUIL and declaration that the Petitioners stands discharged from performance under, Transmission Service Agreement dated 29.1.2018, LTA Agreement dated 29.1.2018 (Tranche 1), Agreement for Long Term Access dated 6.9.2018 (Tranche 2) and Bipartite Connection Agreement dated 11.1.2019 executed between ReNew Power Pvt.Ltd.和印度有限公司的中央传输公用事业(印度较早的电网公司有限公司)因不可抗力和根据印度太阳能公司(Solar Energy Corporation of India India Ltd)执行的第23.5.2022条的效力和绩效的不可能而获得的绩效。请愿人:更新风能(AP2)私人有限公司(RWEPL)ANR。受访者:印度有限公司(CTUIL)和2 ORS的中央传输效用。请愿书56/MP/2022
set aside Transmission Charges bills raised by CTUIL and declaration that the Petitioners stands discharged from performance under, Transmission Service Agreement dated 29.1.2018, LTA Agreement dated 29.1.2018 (Tranche 1), Agreement for Long Term Access dated 6.9.2018 (Tranche 2) and Bipartite Connection Agreement dated 11.1.2019 executed between ReNew Power Pvt.Ltd.和印度有限公司的中央传输公用事业(印度较早的电网公司有限公司)因不可抗力和根据印度太阳能公司(Solar Energy Corporation of India India Ltd)执行的第23.5.2022条的效力和绩效的不可能而获得的绩效。请愿人:更新风能(AP 2)私人有限公司(RWEPL)和ANR。受访者:印度有限公司(CTUIL)和2 ORS的中央传输效用。请愿书56/MP/2022主题:第63条和《电力法》第79条的请愿书,
set aside Transmission Charges bills raised by CTUIL and declaration that the Petitioners stands discharged from performance under, Transmission Service Agreement dated 29.1.2018, LTA Agreement dated 29.1.2018 (Tranche 1), Agreement for Long Term Access dated 6.9.2018 (Tranche 2) and Bipartite Connection Agreement dated 11.1.2019 executed between ReNew Power Pvt.Ltd.和印度有限公司的中央传输公用事业(印度较早的电网公司有限公司)因不可抗力和根据印度太阳能公司(Solar Energy Corporation of India India Ltd)执行的第23.5.2022条的效力和绩效的不可能而获得的绩效。请愿人:更新风能(AP 2)私人有限公司(RWEPL)和ANR。受访者:印度有限公司(CTUIL)和2 ORS的中央传输效用。听证会日期:02.02.2024 Coram:Shri Jishnu Barua,主席Shri Arun Goyal,成员Shri P. K. Singh,在场的会员党派:Shri Vishrov Mukherjee,Rwepl Shri Girik Bhalla,Rwepl Shri Girik Bhalla,Rwepl M. priyanka vyas vyaS vyaS的Rwepl Shri Girik Bhalla Shri M. G. Ramachandran,高级倡导者,Seci Anushree Bardhan女士,倡导者,Seci女士Surbhi Kapoor女士,倡导者,Seci Srishti Khindaria女士,Seci Shri Shri Shubham Arya倡导者,HPPC MS. Pallavi Saigal,suaviel,Suavi s s s suaviel,suavi Saigal,suaviel,suavi s s s suparn su。
“ 24。委员会可能会认为这样做必要或权宜之计,并且出于理由以书面形式记录,放松或偏离这些法规的任何规定。” 29。这是一项既定的法律原则,必须严格解释放松的权力,并要谨慎行使。此外,只有在适用规则或法规引起的不适当困难时才能行使放松的权力。在本案中,请愿人是传输持有人,他已经通过TBCB机制实施了其范围下定义的项目。目前的请愿书是由印度电力部政府通知的办公室命令28.10.2021,该命令已授权CTUIL来确定实施高达卢比的ISTS项目的实施方式。1亿至50亿卢比。根据权力部的指示,CTUIL的办公室备忘录日期为10.7.2023且日期为16.2.2024,已确定通过受监管的关税机制实施的项目列表,其中还包括主题传输系统的即时请愿。