Contact elements spring-loaded contact socket Degree of protection IP67 Material Contacts CuZn Contact surface Au Housing CuZn, nickel-plated Body CuZn Cable PVC Slotted nut Zinc die-casting, nickel-plated Core insulation PVC Cable fine-strand, flexible Sheath diameter Ø 7.1 mm ± 0.15 mm Bending radius Cable, floating: ≥ 107 mm, Cable,固定:≥43毫米颜色灰色内核6 x 2 x 0.14毫米2 +盾牌屏蔽网格覆盖85%
持股比例 1 ABC Cable Network Private Limited 22.45% 2 Adhunik Cable Network Private Limited 78.62% 3 Adventure Marketing Private Limited 100.00% 4 AETN18 Media Private Limited 21.27% 5 Affinity Names Inc. * 100.00% 6 Ambika DEN Cable Network Private Limited 40.09% 7 Amogh Broad Band Services Private Limited 78.62% 8 Angel Cable Network Private Limited 22.45% 9 Antique Communications Private Limited 78.62% 10 Augment Cable Network Private Limited 78.62% 11 Aurora Algae Inc. * 100.00% 12 Bali Den Cable Network Private Limited 40.12% 13 Bee Network and Communication Private Limited 71.96% 14 Bhadohi DEN Entertainment Private Limited 20.45% 15 Big Den Entertainment Private Limited 78.62% 16 Binary Technology Transfers Private Limited 71.96% 17 Blossom Entertainment Private Limited 78.62% 18 Cab-i-Net Communications Private Limited 40.11% 19 Channels India Network Private Limited 68.82% 20 Chennai Cable Vision Network Private Limited 54.68% 21 Colorful Media Private Limited 100.00% 22 Colosceum Media Private Limited 73.15% 23 Crystal Vision Media Private Limited 40.09% 24 AF Communication Private Limited 78.62% 25 Aman Entertainment Private Limited 40.09% 26 Ambey Cable Networks Private Limited 47.95% 27 Ashu Cable Private Limited 40.09% 28 BCN Suncity Network Private Limited 40.11% 29 Bindra Network Private Limited 40.09% 30 Broadband Private Limited 78.62% 31 Den Budaun Cable Network Private Limited 40.09% 32 Den Citi Channel Private Limited 78.62% 33 Den Classic Cable TV Services Private Limited 40.09% 34 Den Crystal Vision Network Private Limited 40.10% 35 Den Digital Cable Network Private Limited 69.63% 36 Den Discovery Digital Network Private Limited 40.09% 37 Den Elgee Cable Vision Private Limited 40.09% 38 Den Enjoy Cable Networks Private Limited 40.09% 39 Den Enjoy Navaratan Network Private Limited 20.45% 40 Den Enjoy SBNM Cable Network Private Limited 20.45% 41 Den FK Cable TV Network Private Limited 40.10% 42 Den Faction Communication System Private Limited 78.62% 43 Den Fateh Marketing Private Limited 40.09% 44 Den Futuristic Cable Networks Private Limited 78.62% 45 DEN Harsh Mann Cable Network Private Limited 40.09% 46 Den Jai Ambey Vision Cable Private Limited 40.10%
三个主要部分〜10 m。第一部分是带有VSI的绝缘低温恒温器“管道中的管道” - 那些低温恒温器与2011年一样,第二部分是由带钢筋的瓦楞纸制成的柔性低温恒温器。主动蒸发低温静态系统。的LH 2流量 - 正在辅助通道,并泵出较低的压力,因此,为了降低温度,第三部分也是具有液氮屏蔽层作为绝缘的柔性低温恒温器。
6.6.1电源电缆连接。........................................................................................... 21 6.6.2 Communication Cable Connection.......................................................................... 22 6.6.3 120ΩResistor Connection......................................................................................... 23 6.6.4 Grounding Cable Connection............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 24 8 Make Your System Run.................................................................................................................. 27 9 Shipment & Maintenance & Storage......................................................................................... 29
NAME PIN NUMBER TYPE DESCRIPTION C1+ 1 Input/Output Positive lead of C1 capacitor V+ 2 Output Positive charge pump output for storage capacitor only C1- 3 Input/Output Negative lead of C1 capacitor C2+ 4 Input/Output Positive lead of C2 capacitor C2- 5 Input/Output Negative lead of C2 capacitor V- 6 Output Negative charge pump output for storage capacitor only DOUT2 7 Output Second RS-232 line data output, cable side RIN2 8 Input Second RS-232 line data input, cable side ROUT2 9 Output Second logic data output, logical side DIN2 10 Input Second logic data input, logical side DIN1 11 Input First logic data input, logical side ROUT1 12 Output First logic data output, logical side RIN1 13 Input First RS-232 line data input, cable side DOUT1 14 Output First RS-232 line data output, cable side GND 15 Ground Ground VCC 16电源电压
7。安装和安装............................................................................................................................................................................................................................................................. 14 7.1安装安全说明....................................................................................... ....................................................................................................................................... 15 7.2.3设备上安装MX模块............................................................................................................................................................................................................................................................................................................................. 16 7.2.4多个MX模块......................................................................... 7.3.1 Cables and wiring .................................................................... 20 7.3.2 Permitted wire and cable types for blue'Log power supply ......... 20 Wire and cable types for device connection ............................................ 21 7.3.3 Shielding ................................................................................. 22 7.4 Interfaces ....................................................................................................................................................................................................................... 22 7.4.1电源...................................................................................................................................................
5.1.1。 DC Voltage.....................................................................6 5.1.2. 交流电压50-60Hz ......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... DC电流....................................................................................................................................................................................................................................................................................................................................................................................................................................... 6 5.1.4。 AC Current.....................................................................6 5.1.5. Resistance.....................................................................6 5.2. General Specifications..............................................................7 6. Operation....................................................................................... 7 6.1. AC/DC Voltage Measurements...................................................7 6.2. AC/DC Current Measurements...................................................7 6.3. Resistance Measurement..........................................................8 6.4. Continuity Check.....................................................................8 6.5. Diode Test..............................................................................8 6.6. 最大保持按钮............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 9 6.7。 保持按钮................................................................................................................................................................................................................................................................................................................................... 9 6.8。 Auto Power Off........................................................................9 6.9. Replacing the Battery...............................................................9 6.10. Replacing the Fuses.................................................................9 7.5.1.1。DC Voltage.....................................................................6 5.1.2.交流电压50-60Hz .........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................DC电流....................................................................................................................................................................................................................................................................................................................................................................................................................................... 6 5.1.4。AC Current.....................................................................6 5.1.5.Resistance.....................................................................6 5.2.General Specifications..............................................................7 6.Operation....................................................................................... 7 6.1.AC/DC Voltage Measurements...................................................7 6.2.AC/DC Current Measurements...................................................7 6.3.Resistance Measurement..........................................................8 6.4.Continuity Check.....................................................................8 6.5.Diode Test..............................................................................8 6.6.最大保持按钮............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 9 6.7。保持按钮................................................................................................................................................................................................................................................................................................................................... 9 6.8。Auto Power Off........................................................................9 6.9.Replacing the Battery...............................................................9 6.10.Replacing the Fuses.................................................................9 7.Multi-Network Modular Cable Tester Option.........................................9 7.1.10 Base-T Test.......................................................................10 7.2.RJ11 Modular Cable Test.........................................................10 7.3.Coaxial Cable Test..................................................................10 7.4.Remote Test..........................................................................10 7.5.Sample Test Results...............................................................11
■ Can operate up to 149° F without D rating ■ Internal diode isolator without voltage drop ■ User friendly design: a solid casing in aluminum, mounting by 4 easily accessible screws ■ A front cover allowing easy access to the charge selector and wiring connections (4 solid 5/16” terminals for the battery outputs) ■ A cable gland for the input cable and a cable grommet with a waterproof seal ■集成控制面板:指示充电曲线(增强,吸收,浮动)以及故障和故障(温度电压,保险丝...)■自动切换:配备3个孤立输出,超过115V/230V,50Hz/60Hz的自动开关(包括2个充电供应,适用于2次充满电源),效果,效果,效率为1次,依次,效率为1次,效率下,效率下,供电效果,效率为downering,decters of Powdersy,附加功能:外部触摸视图控制面板和电池温度传感器(包括)允许充电水平调整■PCB的共形涂层延长电池充电器的寿命■使用内置的CAN CAN BUS J1939接口,可以将海豚Pro连接到任何监视系统
Labrador-Island Link(LIL)从拉布拉多的Muskrat到纽芬兰的士兵池塘的HVDC链接±350 KV,900 MW Bipole LCC计划,OHL/Cable路线长度:1100/35公里:1100/35公里现状:现有状态:在建设中。计划在2017/2018海上链接从纽芬兰的底部布鲁克到新斯科舍省的Woodbine的HVDC链接±200 KV,500 MW VSC计划,OHL/Cable路线长度:470/170/170 km构建状态:施工:470/170 km施工。计划在2017年之前的服务
能源市场管理局(EMA)已批准有条件地批准太阳有线(新加坡)资产PTE Ltd,以从澳大利亚进口1.75 gigawatt(GW)将其从澳大利亚进口到新加坡,这符合新加坡的长期战略,使其能源供应脱碳。预计进口电力将利用澳大利亚北领地的太阳能,并通过新的海底电缆在大约4,300公里的距离内通过新的海底电缆传输到新加坡。2 Sun Cable授予的条件批准认识到,根据迄今为止提交的提案和信息,该项目在技术和商业上可以在技术上和商业上是可行的。条件批准将为太阳电缆提供支持,以继续开发该项目以满足其拟议的商业运营日期,预计将在2035年之后。3 Sun Cable将需要更新其提案,以证明在将项目授予有条件许可之前,在项目授予该项目之前履行了EMA所需条件。此类条件的先例包括遵守EMA的技术要求,并实现客户可以接受的商业价格。Sun Cable还需要确保所有必要的相关司法管辖区的批准,包括电缆通过的国家。4低碳电力进口是新加坡脱碳策略的一部分,该战略目前占我们碳排放量的40%。EMA到2035如果实现,这些项目将共同利用太阳能的多样化组合,5迄今为止,EMA已获得2吉瓦的有条件的从印度尼西亚进口的电力,以及3.6吉瓦的有条件批准,用于从印度尼西亚的1.4 GW,柬埔寨的1GW和1.2 GW的电力进口批准和越南的1.2 GW。