List of Figures Figure 1 Schematic diagram describing the design of a Lithium-Ion Battery [3] .................................... 5 Figure 2 Equivalent circuit for an electrochemical cell ........................................................................... 6 Figure 3 Typical Voltage behavior of the Li-Ion Battery.不同C率的不同曲线[6] ......... 7图4锂离子电池的电压作为不同C率的能量的函数[6]。............................ 9 Figure 5 Operation of a typical Li-ion battery [11] ................................................................................ 13 Figure 6 Typical cycle life of a Li-ion battery cell [11] ........................................................................... 13 Figure 7 Variability in demand and in net load in a challenging week on an area in USA.[31] ..................................................... 27 Figure 19 Maps of Chilean Photovoltaic Power Potential with the location of Campos del Sol [30] ... 27 Figure 20 Irradiation for different longitudes in a) Iquique and b) Copiapó's latitude.[35] ................ 28 Figure 21 Location of the project Campos del Sol PV Power Plant.来自Google Maps的照片。在每个跟踪器中都有28个模块。.................................................... 35 Figure 28 Shading analysis of the PV modules and the trackers ........................................................... 35 Figure 29 Campos del Sol considered losses.............................................................................................................................................................................................................................................................................................................................................................................................................................................................................例如四个不同的日子产生的PV功率,例如。 来自CEN网站。............................................................................................................................................................................................................................................................................................................................................................................................................................................................................例如四个不同的日子产生的PV功率,例如。来自CEN网站。来自CEN网站。................... 15 Figure 8 Power output of a PV plant in Southern California for a partly cloudy day ............................ 15 Figure 9 Balancing Technologies ........................................................................................................... 17 Figure 10 Basic concept of primary frequency regulation through ESS [23] ........................................ 19 Figure 11 : Frequency Control Methods and Relevant Time Scales in US [24] ...................................................................................................................图12频率控制时间尺度(激活时间是德国的示例)[24] ........................................................................................................................................................................................................................................................................................................................................................................................................................................... ................................................................................................ 23 Figure 16 Forecast of monthly power generation for Ollagüe's microgrid [27] ................................... 24 Figure 17 Maps of Chilean Global Horizontal Irradiation with the location of Campos del Sol [30] .... 26 Figure 18 Typical geography of the northern regions of Chile...................................................... 42 Figure 35 Energy profile produced by the PV in 25 years, with linear reduction of the power............................................................... 57 Figure 40 Variation of the relative initial cost of the BESS according to the size considered................................................... 60 Figure 44 Carrera Pinto 2020 Energy Price............ 30 Figure 22 Panoramic view of the area where the PV Plant will be situated (Google Maps) ................ 31 Figure 23 Carrera Pinto Interconnection Substation ............................................................................ 31 Figure 24 Irradiance of the area of Campos del Sol PV Plant ................................................................ 32 Figure 25 Module data .......................................................................................................................... 33 Figure 26 Inverter Data ......................................................................................................................... 34 Figure 27 Tracker structure......................................................................................... 36 Figure 30 Campos del Sol computed annual PV Power ........................................................................ 37 Figure 31 Campos del Sol generated Power for the first week of the year, computed with SAM ....... 38 Figure 32 Block Diagram of the Considered System ............................................................................. 40 Figure 33 Simplified Electric考虑系统的互连方案。................................ 43图36模型的温度评估模型................................................................................................................................. 57 Figure 41 Carrera Pinto Substation Energy Prices for different days of year 2020............................... 58 Figure 42 Considered Price Scenario ..................................................................................................... 59 Figure 43 Prices Profile Scenarios for the first three days of January........................................................... 65 Figure 45 NPV and Cash Flow for the BESS 50 MW 50 MWh................................................................ 66
▶ 2023 年领英顶级公司中智利 25 家最佳公司 ARAUCO 在该排名中被选为智利最佳公司之一,该排名涵盖了智利的重要公司,并分析了员工的晋升和在工作期间获得技能等多项因素。 ▶ 工业化住宅挑战赛中的认可 在智利住房短缺的背景下,它与 Tallwood 和 Tree Engineering 联合参加了由智利建筑商会、零赤字、工业化建筑委员会 CCI、CTEC | 建筑创新技术中心和智利住房和城市化部 (MINVU) 组织的这项倡议,获得了唯一授予使用木材建造的房屋的认可。 ▶ 在文化变革类别中获得第一名,在生产流程重新设计类别中获得第二名,零废物 2023 奖项 智利最重要的回收和废物管理活动表彰了那些通过具体举措,旨在增加废物回收、减少最终处置的废物并提高社区对循环利用问题认识的组织。
得到以下组织的支持和投入:医疗保健模拟实践协会 (ASPiH) • 标准化病人教育者协会 (ASPE) • 澳大利亚医疗保健模拟协会 (ASSH) • 巴西健康模拟协会 (Abrassim) • 加拿大医疗保健模拟网络 (CNSH) • 智利临床模拟协会 • 荷兰医疗保健模拟协会 (DSSH) • 国际护理临床学习模拟协会 (INACSL) • 国际儿科模拟协会 (IPSS) • 意大利医疗保健模拟协会 • 日本医疗保健教学系统协会 (JSISH) • 韩国医疗保健模拟协会 (KoSSH) • 拉丁美洲临床模拟协会 (ALASIC) • 新西兰医疗保健模拟协会 (NZASH) • 泛亚医疗保健模拟协会 (PASSH) • 波兰医学模拟协会 (PSMS) • 葡萄牙模拟协会 (SPSim) • 俄罗斯医学模拟教育协会 (ROSOMED) • 欧洲医学应用模拟协会 (SESAM) •西班牙临床模拟与患者安全协会 (SESSEP)
我们研究市场整合对可再生能源扩展的投资影响。我们的理论强调,市场整合不仅可以通过贸易获得的收益提高分配效率,而且还激励了对可再生电厂的新投资。为了测试我们的理论预测,我们研究了智利电力市场最近的电网扩张如何改变了电力生产,批发价格,一代成本和可再生投资。然后,我们建立了一个发电厂进入的结构模型,以量化有或没有投资效应的市场整合的影响。我们发现,智利的市场整合太阳能发电量增加了约180%,使发电成本降低了8%,并将碳排放量降低了5%。在没有市场整合的情况下,不会发生大量可再生条目。我们的发现表明,忽略这些投资效应将大大低估市场整合的好处及其在扩大可再生能源中的重要作用。
我们研究了市场整合对可再生能源扩张的静态和动态影响。我们的理论强调,从静态上讲,市场整合通过贸易收益提高了配置效率,从动态上讲,它激励了可再生能源发电厂的新进入。利用智利电力市场最近的两次电网扩张,我们对我们的理论预测进行了实证检验,并表明,如果可再生能源投资是在市场整合的预期下进行的,那么常用的事件研究估计会低估动态效益。我们建立了一个发电厂进入的结构模型,并展示了如何纠正这种偏差。我们发现,市场整合导致各地区价格趋同、可再生能源发电增加、发电成本和污染排放减少。此外,如果没有市场整合,就不会出现大量可再生能源进入的情况。我们表明,忽略这种动态效应将大大低估输电投资的效益。
我们签署了约 5 GW 的新风能、太阳能、水力和储能项目合同,比我们历史上任何一年都多,比 2020 年增长了 65%。这一增长的背后是对创新和伙伴关系的关注。我们与世界上许多最大的公司和组织合作,从智利铜矿公司到美国的科技公司,开发融合新方法、新技术和商业结构的新解决方案。2021 年,我们启动了第一个大型可再生能源项目,该项目利用风能、太阳能、水力和储能资源,确保客户全年都能获得每小时的可再生能源来满足其需求,Axios 将其称为“企业清洁能源的新前沿”2。我们还因位于加州的 Alamitos BESS 项目推动全球储能行业发展而创纪录地第七次荣获爱迪生电气协会 (Edison Electric Institute) 的 EEI 奖,这是该行业的最高荣誉。
与通过此次交易进入智利市场的独立电力生产商 ContourGlobal 达成的协议包括资产 5 年的运营和维护,以及电池等设备的供应,这要归功于 Grenergy 与第三方达成的战略协议。Grenergy 已经通过绿色贷款完成了这三个阶段的融资,总额为 6.43 亿美元。通过此次交易,Grenergy 提前实现了其 2026 年设定的资产轮换目标。通过这种方式,该公司确保了其战略计划中预计的 26 亿欧元投资资金,从而成为能源存储领域的全球领导者。 Grenergy 执行主席 David Ruiz de Andrés 表示:“这笔交易为我们创造了巨大的价值,这笔交易仅占智利阿塔卡马绿洲的 23%。我们将继续在该国开发许多其他项目,其模式专注于储能,我们希望在我们运营的其他市场(如美国和欧洲)复制这种模式。我们决心在未来几年成为能源存储领域的全球领导者。很高兴与 ContourGlobal (KKR) 达成这项协议,我们希望这将是众多协议中的第一个。”
在锂的情况下,我们必须提及这种剥削对智利的影响,正如我们已经看到的那样,这代表了世界产量的四分之一。智利锂开采的大量研究16表明,在已经非常干旱的地区Atacama沙漠中,采矿活动导致地下水水平降低。这导致了当地人的水压力,植被减少,并部分干燥了洛斯·弗拉门戈斯自然保护区,并影响了生物多样性。Atacama地区的两家锂矿业公司以及附近的两家铜矿公司的提取量为每秒4,230升淡水。相比,提取的用于处理和分配水的体积平均每秒17升5,590升。在国家一级,2016年,智利当局认为该国70%的水用于采矿业务,而农业部门只有17%的人,只有13%的人可以供人类消费,这是一种令人震惊的想法,鉴于在未来几年中,干旱将变得更加频繁和严重。
尚未意识到灾难的程度 圣地亚哥。8 月 21 日。直到现在,人们才开始意识到灾难的严重性。许多房屋的大部分都不安全,不适合居住,当局已经组织了一支特别部队来拆除摇摇欲坠的建筑物。在大多数街道上,由于碎石掉落,在人行道上行走并不安全。圣地亚哥就像一个营地。公共广场和主要大街上挤满了露天睡觉的人。8 月 10 日的夜晚,闪电和倾盆大雨使天气变得可怕。整个晚上,强烈的地震持续发生,导致电线和电缆断裂,引起了极大的恐慌,而消防警钟的响起,宣布城市各处发生火灾,更是加剧了恐慌。第一次大地震持续了四分五十秒。在圣地亚哥居民的记忆中,从来没有发生过这么长时间的地震。专家们说,唯一能拯救圣地亚哥免于彻底毁灭的是,地震是圆形的。主震从瓦尔帕莱索到圣地亚哥和拉马什,震中位于利马什。后两个城镇以及奎尔洛塔和拉亚尔都被摧毁了。海军天文台在地震发生前两天宣布了地震的临近。由于电报和电话的普及,当局在目前情况下的任务今天变得更加容易。
国家空间研究所 (INPE) 和巴西航天局、加拿大航天局 (CSA)、智利陆军军事研究中心、哥伦比亚空军、埃及航天局、埃塞俄比亚空间科学技术研究所、欧空局、欧洲联盟空间计划署 (EUSPA)、法国国家空间研究中心 (CNES)、加蓬空间研究和观测局、德国航空航天中心 (DLR)、印度空间研究组织 (ISRO)、伊朗空间研究中心、肯尼亚航天局、墨西哥航天局、摩洛哥皇家遥感中心、尼日利亚国家空间研究和发展局、荷兰空间局、巴基斯坦空间和高层大气研究委员会、巴拉圭航天局、卢旺达航天局、沙特航天委员会、瑞典国家航天局、土耳其航天局、阿拉伯联合酋长国航天局、美国国家航空航天局 (NASA)、乌兹别克斯坦空间监测和地理信息技术中心及空间技术和研究局以及津巴布韦国家地理空间和航天局。