The UC TAP tool is designed for use by students transferring from California community colleges, including those students who are seeking a Transfer Admission Guarantee (TAG) with one of the six participating UC campuses. UC TAP is a free online tool to help prospective UC transfer students track and plan their coursework (completed and planned) from the very beginning of their college careers, or at any point when they decide to transfer to a UC campus. It's also a source to receive important messages, not only does it allow UC Staff to communicate important information to prospective transfer students, it's also a way for CCC counselors to communicate with their students and share important information regarding upcoming events/visits from UC representatives. UC TAP streamlines admission and major preparation advising and, Lastly, Academic History on UCTAP can be imported to the UC application
As South Sudan's transition period draws towards its end, with a new constitution and national elections planned to take place by December 2024, the question of democratic and civic space has assumed heightened importance.Based on the Commission's independent investigations, this paper examines the current situation of South Sudanese media and civil society actors.对媒体和民间社会的压制待遇是负责治理和民主社会的前景的关键指标。The paper details how the National Security Service has instituted a pervasive and unlawful censorship regime to curtail independent media, and imposed widespread restrictions and surveillance on civil society groups and their activities.It further highlights the persistence of attacks on journalists and human rights defenders both in and outside South Sudan, as well as online, often involving human rights violations carried out with absolute impunity.
从这个意义上讲,国际能源机构(AIE)在2023年11月发布的报告“净零过渡中的石油和天然气行业”中指出,如果捕获,存储和使用碳的储存技术对于发展到净零排放量至关重要,那么它们就无法成为现状或氢碳产量的提高。Both from a scientific, economic and energy point of view, this strategy is a nonsense: "If the consumption of oil and natural gas continues as planned with current policies, it would be necessary to capture 32 billion tonnes of carbon by 2050, including 23 billion via direct capture in the air, to limit warming to 1.5 ° C.必要的技术在2050年需要26,000次电力Terawatt小时,超过2022年的全球需求,并且年度投资将超过35亿美元,直到2050年,相当于所有行业的近期年收入。“(免费翻译)
22INR0445 SPC Bloom BESS 计划中 Victoria Battery LLC 8911 Black Bayou 138kV Victoria SOUTH 6/1/2023 100. 20INR0290 River Valley Storage 1 计划中 KCE TX 19, LLC 3650 Elgin SS 138kV Williamson SOUTH 6/23/2023 51.5 20INR0293 River Valley Storage 2 计划中 KCE TX 21, LLC 3650 Elgin SS 138kV Williamson SOUTH 6/23/2023 51.5 22INR0551 Wolf Tank Storage 计划中 Lobo Storage 80221 LOBO 138kV Webb SOUTH 7/1/2023 155.48 20INR0281 Queen BESS 计划中 Roadrunner Storage, LLC 842 GPL King Mountain 345kV Upton WEST 7/14/2023 51.06 22INR0509 Turquoise Storage 计划中 BT Cunningham Storage, LLC 6950 Wallace Switch 138kV Hunt NORTH 7/31/2023 196.21 23INR0514 AEP_N_MERCED_LD01_(SMT MercePlanned SMT MERCEDES LLC 站名称 (TDSP 站代码): N_MERCEDLoad/Load Transformer NHidalgo SOUTH 8/25/2023 9.99 22INR0495 TIMBERWOLF BESS 2 计划中 Crane 2 BESS, LLC 76635 King Mt 138kV Crane WEST 9/1/2023 150. 23INR0477 North Alamo BESS 计划中 SMT Alamo LLC N_ALAMO / LD02 / BUS#8906 / 138KV Hidalgo SOUTH 9/17/2023 9.99 23INR0507 Bay City BESS 计划中 SMT Bay City LLC BAY_CITY / 138_12_1 / BUS#8113 / 138KV Matagorda COASTAL 9/22/2023 9.99 22INR0398 Sabal Storage 计划中 Cameron Wind 1, LLC 5761 Paredes 138kV Cameron COASTAL 9/30/2023 18. 23INR0510 Rio Grande City BESS 计划中 SMT RIO GRANDE II LLC RIO_GRAN / LD02 / BUS#8797 / 69KV Starr SOUTH 10/1/2023 9.99 23INR0515 AEP_S_SNRSA_LD01(SMT Santa Ro计划中 SMT SANTA ROSA LLC 站名称(TDSP 站代码):S_SNROSA 负载/负载变压器 NCameron COASTAL 10/7/2023 9.99 23INR0569 Weil Tract BESS 计划中 HEN Infrastructure, LLC 2 WEIL_TRC/8482/138_12/WEIL_TRC_LD1 Nueces COASTAL 10/13/2023 9.9 23INR0512 West Harlingen BESS 计划中 SMT HARLINGEN II LLC 站名称(TDSP 站代码):W_HARLIN 负载/负载变压器 NCameron COASTAL 10/14/2023 9.99 23INR0513 AEP_ELSA_ELSA_L1_(SMT Elsa) 计划中 SMT ELSA LLC 站名称(TDSP 站代码):ELSALoad/Load 变压器名称:EHidalgo SOUTH 10/22/2023 9.99 22INR0485 House Mountain 计划中 House Mountain LLC 6674 Bronco 69kV Brewster WEST 10/26/2023 63. 23INR0511 Mayberry BESS 计划中 SMT MISSION LLC MAYBERRY / LOAD1 / BUS#8109 / 138KV Cameron COASTAL 10/29/2023 9.99 23INR0371 Rodeo Ranch Energy Storage 计划中 Rodeo Ranch Energy Storage, LLC 38021 WORSHAM 138kV Reeves WEST 11/6/2023 307.46 23INR0521 Junction BESS 计划中 HEN Infrastructure, LLC 2 JUNCTION/LD1 总线 6400 Kimble 南 11/7/2023 9.95 23INR0570 Mineral Wells East BESS 计划中 HEN Infrastructure, LLC 2 MINWLLSE1_8/1584/LDLXFMR1 Palo Pinto NORTH 11/8/2023 9.95 23INR0508 Los Fresnos BESS 计划中 SMT LOS FRESNOS LLC L_FRESNO / LD1 / 总线编号 8333 / 138KV Cameron 沿海 11/12/2023 9.99 23INR0509 Garceno BESS 计划中 SMT RIO GRANDE LLC GARCENO / LD01 / 总线编号 8923 / 138KV Starr 南 11/19/2023 9.99 23INR0522 Diboll Bess 计划中 HEN Infrastructure, LLC 1 站名称(TDSP 站代码):DIBOLLoad/Load 变压器名称:Angelina NORTH 11/25/2023 9.95 22INR0366 BRP Libra BESS 计划中 Libra Storage LLC 5133 Elm Creek 345kV Guadalupe SOUTH 11/27/2023 206.21 23INR0523 Damon_Storage 计划中 Baccharis Storage LLC 站名称:DALoad/Load 变压器名称:TR1PTI 总线编号:42Brazoria COASTAL 12/1/2023 5. 24INR0073 Hyacinth Storage 计划中 Hyacinth Storage, LLC 46500 Tomball 345 kV Harris HOUSTON 12/1/2023 103.05 23INR0239 Giga Texas Energy Storage 计划中 Giga Texas Energy, LLC。 7047 Hornsby 345kV Travis SOUTH 12/15/2023 131.05 23INR0565 Garden City East BESS 计划中 HEN Infrastructure, LLC 2 GARDCITYE_9/LDLXFMR1/GRDNE_LD3 Glasscock WEST 12/19/2023 9.95 23INR0369 Anemoi Energy Storage 计划中 Anemoi Energy Storage, LLC 8574 POMELO 345kV Hidalgo SOUTH 12/20/2023 205. 23INR0543 Continental BESS 计划中 Regis Continental, LLC 站名称(TDSP 站代码):CONTINENLoad/Load Transformer N Starr SOUTH 12/20/2023 9.8 22INR0372 Hydra BESS 计划中 BRP Hydra BESS LLC 76002 贝克斯菲尔德 345kV 佩科斯西部 12/21/2023 200.8 22INR0468 下里约 BESS 计划中 VESI 38 LLC 5792 苏族 138kV 伊达尔戈南部 12/30/2023 60. 22INR0325 狄更斯 BESS 计划中 BRP 狄更斯 BESS LLC 59904 科顿伍德 345kV 狄更斯 潘汉德尔 12/31/2023 200.8 23INR0485 Hacienda Storage 计划中 Galveston Energy Storage LLC 38745 阿特沃特 138kV 加尔维斯顿 休斯敦 12/31/2023 203. 22INR0322 Paleo BESS 计划中 BRP Paleo BESS LLC 23920 布莱克沃特 Draw 345kV Hale PANHANDLE 12/31/2023 200.8 23INR0072 Tortolas BESS 计划中 BRP Tortolas BESS LLC 39030 Alvin 138kV Brazoria COASTAL 12/31/2023 50.3 23INR0554 Hamilton BESS 计划中 HEN Infrastructure, LLC 1 站名称(TDSP 站代码):HAMILTONLoad/Load Transformer NaVal Verde WEST 2/15/2024 9.95 23INR0330 BRP Snowdon BESS 计划中 BRP SNOWDON BESS LLC 23914 Tule Canyon 变电站 345kV Briscoe PANHANDLE 2/16/2024 410.94 22INR0338 Limousin Oak Storage 计划中 KCE TX 15, LLC 44645 Singleton 345kV格莱姆斯 北 2/23/2024 104.62 22INR0327 Hummingbird Storage 计划中 KCE TX 10, LLC 1730 克鲁姆 345kV 登顿 北 2/24/2024 103.8 23INR0620 法尔富里亚斯 BESS 计划中 HEN INFRASTRUCTURE LLC 1 FALFUR/2_138_12/8510 布鲁克斯 南 3/7/2024 9.98 22INR0372 Hydra BESS 计划中 BRP Hydra BESS LLC 76002 Bakersfield 345kV Pecos WEST 12/21/2023 200.8 22INR0468 Lower Rio BESS 计划中 VESI 38 LLC 5792 Sioux 138kV Hidalgo SOUTH 12/30/2023 60. 22INR0325 Dickens BESS 计划中 BRP Dickens BESS LLC 59904 Cottonwood 345kV Dickens PANHANDLE 12/31/2023 200.8 23INR0485 Hacienda Storage 计划中 Galveston Energy Storage LLC 38745 Attwater 138kV Galveston HOUSTON 12/31/2023 203. 22INR0322 Paleo BESS 计划中BRP Paleo BESS LLC 23920 Blackwater Draw 345kV Hale PANHANDLE 12/31/2023 200.8 23INR0072 Tortolas BESS 计划中 BRP Tortolas BESS LLC 39030 Alvin 138kV Brazoria COASTAL 12/31/2023 50.3 23INR0554 Hamilton BESS 计划中 HEN Infrastructure, LLC 1 站名称(TDSP 站代码):HAMILTONLoad/Load Transformer NaVal Verde WEST 2/15/2024 9.95 23INR0330 BRP Snowdon BESS 计划中 BRP SNOWDON BESS LLC 23914 Tule Canyon Substation 345kV Briscoe PANHANDLE 2/16/2024 410.94 22INR0338 Limousin Oak Storage 计划中KCE TX 15, LLC 44645 Singleton 345kV Grimes NORTH 2/23/2024 104.62 22INR0327 Hummingbird Storage 计划中 KCE TX 10, LLC 1730 Krum 345kV Denton NORTH 2/24/2024 103.8 23INR0620 Falfurrias BESS 计划中 HEN INFRASTRUCTURE LLC 1 FALFUR/2_138_12/8510 Brooks SOUTH 3/7/2024 9.98 22INR0372 Hydra BESS 计划中 BRP Hydra BESS LLC 76002 Bakersfield 345kV Pecos WEST 12/21/2023 200.8 22INR0468 Lower Rio BESS 计划中 VESI 38 LLC 5792 Sioux 138kV Hidalgo SOUTH 12/30/2023 60. 22INR0325 Dickens BESS 计划中 BRP Dickens BESS LLC 59904 Cottonwood 345kV Dickens PANHANDLE 12/31/2023 200.8 23INR0485 Hacienda Storage 计划中 Galveston Energy Storage LLC 38745 Attwater 138kV Galveston HOUSTON 12/31/2023 203. 22INR0322 Paleo BESS 计划中BRP Paleo BESS LLC 23920 Blackwater Draw 345kV Hale PANHANDLE 12/31/2023 200.8 23INR0072 Tortolas BESS 计划中 BRP Tortolas BESS LLC 39030 Alvin 138kV Brazoria COASTAL 12/31/2023 50.3 23INR0554 Hamilton BESS 计划中 HEN Infrastructure, LLC 1 站名称(TDSP 站代码):HAMILTONLoad/Load Transformer NaVal Verde WEST 2/15/2024 9.95 23INR0330 BRP Snowdon BESS 计划中 BRP SNOWDON BESS LLC 23914 Tule Canyon Substation 345kV Briscoe PANHANDLE 2/16/2024 410.94 22INR0338 Limousin Oak Storage 计划中KCE TX 15, LLC 44645 Singleton 345kV Grimes NORTH 2/23/2024 104.62 22INR0327 Hummingbird Storage 计划中 KCE TX 10, LLC 1730 Krum 345kV Denton NORTH 2/24/2024 103.8 23INR0620 Falfurrias BESS 计划中 HEN INFRASTRUCTURE LLC 1 FALFUR/2_138_12/8510 Brooks SOUTH 3/7/2024 9.9
道路名称,治疗类型社区反馈待遇待办事项,布罗姆利公路行人穿越点行人安全(近社区中心)计划已批准;施工计划的25财年交通镇定速度驼峰载有重型车辆量,超速车辆计划已批准;施工计划的25财年赛普拉斯街道交通镇定速度驼峰超速车辆建设完成了Q1 FY25 Keighleys Road交叉路口交通交通镇定的超速车辆计划批准;施工计划的25财年行人穿越点行人安全(近学校)批准;施工计划的25财年交通镇定速度驼峰超速车辆计划已批准;施工计划的FY25 McGregors Road交叉路口交通镇定的超速车辆计划已批准;施工计划的FY25交通镇定速度驼峰超速车辆
● 信息自由法 (FOIA) 发现 AI 试点,使用基于 NLP 的技术搜索文档并根据 FOIA 请求的性质编辑信息(研发阶段) ● 国家解密中心 (NDC) 的 AI 试点,标记可解密的机密文件的内容,在发布前编辑信息并跟踪解密过程(计划) ● 在 ERA 和 EOP 系统上进行培训,以开发用于生成 AI 的新大型语言模型 (LLM)(计划) ● 根据开发的自定义模型为 ERA/EOP/DAS 开发语义搜索(计划) ● 开发基于自然语言的聊天界面(如 ChatGPT)以与 ERA/EOP/DAS 文档进行交互(计划) ● 使用 VA 的数字化记录探索基于 AI 的 CMRS 搜索(计划) ● 在处理退伍军人文件时为 CMRS 创建基于 AI 的知识文章聊天界面(计划)
The proposed developments contribute to outcomes 1, 2,3,4,5, 6,7, 8 and 9 Personnel: Recruitment and training across HSCP and third sector services will be required to deliver the strategic priorities. Carers: Carers and families are key members of the Glasgow City ADP. The identified priorities align with the Glasgow City Carers Strategy. Provider Organisations: Third sector colleagues are key members of the Glasgow City ADP and their involvement is vital to the delivery of the priorities. Equalities: An assessment of the impact of the ADP Strategy Refresh on protected characteristics has been carried out as part of the development of the strategy https://glasgowcity.hscp.scot/publication/eqia-alcohol-and- drug-partnership-strategy-2023-2026 Fairer Scotland Compliance: The strategy refresh sets out the activity the ADP will carry out, which will contribute to alleviation of the impact of socio-economic disadvantage experienced by some within the city. Financial: None. Legal: The planned implementation of the Safer Drug Consumption Facility requires a statement of prosecution from the Lord Advocate. Work is underway to meet the requirements of the Lord Advocate as detailed in https://glasgowcity.hscp.scot/publication/item-no-07- implementation-safer-drug-consumption-facility
Thermal 86,791 71,741 Natural Gas 66,810 53,200 Combined-cycle 45,449 34,350 Combustion Turbine 9,542 7,488 Internal Combustion Engine 732 732 Steam Turbine 11,086 10,631 Compressed Air Energy Storage - - Coal 14,713 13,568 Nuclear 5,268 4,973 Renewable,间歇性[6] 64,102 13,743太阳能24,576 -WIND 39,526 13,743沿海5,436 1,894 PANHANDELE 4,669 1,627其他29,421 10,421 10,221 10,222可再生,其他749 604生物群174 163 Hydrolect in Storate soutem soute 6,899 937 Batteries 6,899 937 Other - - DC Tie Net Imports 1,220 817 Planned Resources [5] Thermal 24 24 Natural Gas 14 14 Combined-cycle - - Combustion Turbine - - Internal Combustion Engine - - Steam Turbine 14 14 Compressed Air Energy Storage - - Diesel 10 10 Renewable, Intermittent [6] 917 - Solar 917 - Wind - - Coastal - - Panhandle - 其他 - 储能,可用的充电状态1,091 151电池1,091 151其他 -
我们对 NSF 的项目和运营以及其资助的奖项和协议提供独立、客观的评估。根据法规,我们必须进行特定的审计和审查。我们还通过年度规划流程确定可自由支配的项目。该计划列出了我们在 2025 财年正在进行和计划中的活动以及我们正在监控的领域。我们可能会更改计划以解决出现的更高优先级问题或响应国会的要求。必需项目 • 对 NSF 财务报表的审计 • 对 2014 年《联邦信息安全现代化法案》合规情况的审计 • 对 2019 年《支付诚信信息法案》合规情况的审查 • 采购卡风险评估 • 对 NSB 遵守《阳光法案》的风险评估 自由裁量项目 • 对分包管理和支出的审计(正在进行) • 对 NSF 奖项获得者的审计(正在进行和计划中) • 对 NSF 南极职业安全与健康计划的评估(正在进行) • 对 NSF 对 OMB M 22-09《推动美国政府走向零信任网络安全原则》合规情况的评估(正在进行) • 审查 NSF 在管理职位上使用非联邦雇员的情况(正在进行) • 审查 NSF 获奖者是否遵守 NSF 骚扰条款和条件(正在进行) • 审查单项审计的质量(正在进行)和计划中) • 审计 USAP 车队维护、设施维护和南极基础设施现代化以进行科学建设项目(进行中) • 审计 NSF 和获奖者是否遵守研究安全要求(进行中) • 审计 NSF 审查员工和承包商的流程(计划中) • 审计南极支持合同监督(计划中) • 审计 NSF 天文科学部管理的主要设施(计划中) • 审计 NSF 对罗伯特·诺伊斯教师奖学金计划的监督(计划中) • 检查大学大气研究航空安全环境(计划中) • 评估 NSF 的云安全控制(计划中) • 审查国家人工智能研究资源计划(计划中)我们正在监测的领域 • 采购南极科学与工程支持合同 • 监督 NSF 的技术、创新和伙伴关系理事会及其新兴计划
