• Existing Facilities • These are buildings that are already in the USPS network—it doesn't mean they are already an SDC or an RPDC • New Building • A building that must either be built, purchased, or leased to become an RPDC or other facility • Re-Stack • The taking of an “Existing Facility”, taking out machines, remodeling, adding equipment, etc.使其成为RPDC,LPC,SDC等
✓ This rebate form fully completed and AHRI Certificate showing certified reference number ✓ A copy of your receipt or invoice showing model number for each item purchased ✓ Documentation showing proof of installation or service date Submit required documentation to: 1775 Lake Shady Ave South, Oronoco, MN, 55960 or rebates@peoplesenergy.coop MEMBER INFORMATION ( Please fill out entire section) Member Name Email Email addresses are used for cooperative通讯。地址帐户电话城市邮政编码日期会员签名折扣:󠇯󠇯居住󠇯󠇯农场󠇯󠇯商业󠇯󠇯工业󠇯󠇯机构/政府󠇯󠇯
If plan includes an annual deductible, the annual deductible applies to all services except Hospice One-Time Consultation, Ambulance Services, Emergency Care, Urgently Needed Services, Diabetic Supplies if purchased from pharmacy, Blood Glucose Monitors if purchased from pharmacy, Diabetes Self-Management Training, COPD Testing, Blood and Glaucoma Screening, Diabetic Retinopathy Screening, Abdominal Aortic Aneurysm Screening, Bone Mass Measurement, Colorectal Cancer Screening and Colorectal Services, HIV Screening, Screening for Sexually Transmitted Infections (STIs) and Counseling to Prevent STIs, Medicare Part B Immunizations, Breast Cancer Screening (Mammogram), Cervical and Vaginal Cancer Screening, Prostate Cancer Screening Exams, Cardiovascular Disease Risk Reduction Visit, Cardiovascular Disease Testing, Welcome to Medicare Preventive Exam, Annual Wellness Visit, Depression Screening, Diabetes Screening, Medicare Diabetes Prevention Program (MDPP), Obesity Screening and Therapy to Promote Sustained Weight Loss, Screening and Counseling to Reduce Alcohol Misuse, Screening for Lung Cancer with Low Dose Computed Tomography, Medical Nutrition Therapy, Smoking and Tobacco Use Cessation, Kidney Disease Education Services, Outpatient Dialysis Treatments, Home Dialysis, Self- Dialysis Training, Part B药物与管理,化学疗法B部分药物和管理,常规听力服务,年度常规体格检查,LiveHealth Online,Fitness,护士系和外国旅行。请注意,所有这些福利类别都可能在此收益摘要中列出。
自2019-20财年以来,我们的GHG帐户范围已扩大到包括逃犯,在家中工作,废物,购买的商品和服务(以前以有限的物质使用方式报告),购买的资本货物,上游租赁,上游运输和分配以及与燃料和燃料相关的活动。还对数据收集和准确性进行了迭代改进。表2在我们致力于到2030年努力在所有范围内致力于净零温室气体排放的背景下列出了我们的温室气体排放,并违反了我们的2019 - 20年基线。购买的商品和服务和购买的资本货物的排放量在单独的专栏中分配。对基线数字的总排放和变化不包括这些类别,可以与基线进行更清晰的比较。与2019 - 20年的基线相比,在2022-23财年,购买商品和服务以及购买的资本货物的总排放量减少了14%。包含购买的商品和服务和购买的资本货物,范围3的排放显然是自基线以来的最大增加,而范围1和2排放都下降了,范围2(购买的电力)降低了42%。表2。到2030年目标对我们的净零进展。
• Reduced our Scope 1 emissions for company cars through having more options available for electric and hybrid cars • Reduced our Scope 2 purchased electricity emissions through switching electricity contracts to renewable energy • Launched an electric car salary sacrifice scheme enabling employees to lease an electric vehicle • Refurbished our Burton-on-Trent office to be energy efficient achieving an Energy Performance Certificate (EPC) rating of B • Installed electric vehicle (EV)我们在trent-on-trent办公室的收费点,从笨蛋转移到雷黑德,现在员工可以使用电动汽车充电点•通过使不需要的办公设备可重复使用来减少浪费•提高了用于汇编我们的碳库存的数据质量,通过更改我们的费用报告系统。员工现在输入使用公共交通工具时的实际距离。
• 3.1 Purchased other (including water, paper, external data centres, electronic devices, and gastronomy) • 3.3 Fuel-and-energy-related activities (not included in Scope 1 or 2) • 3.4 Upstream transportation and distribution • 3.5 Waste generated in operations • 3.6 Business travel • 3.7 Employee commuting (including working-from-home emissions) Category 3.9 Downstream transportation and distribution was omitted as all Diggia Group英国的入站和出站物流由报告公司支付,因此位于3.4类。diggia Group UK计划将其碳测量的范围扩展到包含进一步的范围3类别,其理解是其运营的重要性,包括以下类别; 3.1购买的商品和服务,3.11使用已销售的产品以及3.12销售产品的寿命终止处理。基线年2023年排放:
区政府从镇区供应商处采购了 24% 的商品,另外 24% 的商品来自女性拥有的企业,而 85% 的商品来自男性拥有的供应商,最低的 9% 的商品来自青年拥有的供应商,不到 1% 的商品来自残疾人。在下一个财政年度,该区鼓励更多青年拥有的企业参与采购机会,市长委员会将发挥监督作用,确保他们参与这些经济机会。
对两栋建筑物的重要能源用户进行深入研究吸引外部顾问对2014年法定工具(SI)131中规定的所有站点进行独立的能源审核将组织都柏林办公室中所有光线重新点燃。 which are used to regulate the organisation's heating, ventilation and air conditioning (HVAC) system Revising procurement practices and ensuring energy-efficient equipment was purchased wherever possible The implementation of auto shutdown systems for on-site computer equipment The upgrade of passive infrared sensors on the lighting systems to ensure that only the lights needed were being used Working with the landlord and the OPW in the Smithfield office to replace the gas boilers to确保实现最大效率