16 2/7/2011 2/7/2011 Withdrawn 3/21/12 PV S 2 2 - San Diego CA SDGE Santa Ysabel Substation - Distribution Circuit 220 9/1/2011 N/A N/A N/A N/A N/A Project Withdrawn 17 2/9/2011 2/9/2011 Withdrawn 1/13/14 PV S 5 5 FC San Diego CA SDGE Boulevard Substation - Distribution Circuit 444 7/1/2012 N/A N/A N/A N/A N/A Project Withdrawn 18 2/9/2011 2/9/2011 Withdrawn 04/21/11 PV S 2 2 - San Diego CA SDGE Boulevard Substation - Distribution Circuit 444 9/1/2011 N/A N/A N/A N/A N/A Project Withdrawn 19 2/11/2011 2/11/2011 Withdrawn 03/16/11 PV S 2 2 - San Diego CA SDGE Borrego Substation - Distribution Circuit 171 9/1/2011 N/A N/A N/A N/A N/A Project Withdrawn 20 2/11/2011 2/11/2011 Withdrawn 03/16/11 PV S 2 2 - San Diego CA SDGE Borrego Substation - Distribution Circuit 172 9/1/2011 N/A N/A N/A N/A N/A Project Withdrawn 21 2/15/2011 2/15/2011 Withdrawn 1/18/13 PV S 3 3 FC San Diego CA SDGE Boulevard Substation - Distribution Circuit 445 7/1/2012 N/A N/A N/A N/A N/A Project Withdrawn 22 2/15/2011 2/15/2011 Withdrawn 04/21/11 PV S 2 2 - San Diego CA SDGE Boulevard Substation - Distribution Circuit 445 9/1/2011 N/A N/A N/A N/A N/A Project Withdrawn 23 2/16/2011 2/16/2011 Withdrawn 3/21/12 PV S 2 2 - San Diego CA SDGE Potrero Substation - Distribution Circuit 448 9/1/2011 N/A N/A N/A N/A N/A Project Withdrawn 24 2/16/2011 2/16/2011 Withdrawn 3/21/12 PV S 2 2 - San Diego CA SDGE Barrett Substation - Distribution Circuit 157 9/1/2011 N/A N/A N/A N/A N/A Project Withdrawn 25 2/16/2011 2/16/2011 Withdrawn 3/21/12 PV S 2 2 -San Diego CA SDGE CAMERON变电站 - 分销电路449 9/1/2011 N/A N/A N/A N/A N/A N/A N/A n/A n/a项目
。cc-by-nd 4.0国际许可证可永久提供。是作者/资助者,他已授予Medrxiv的许可证,以显示预印本(未经同行评审证明)预印版本的版权所有者此版本发布于2024年8月30日。 https://doi.org/10.1101/2023.05.19.23290214 doi:medrxiv Preprint
参考文献 1 世界卫生组织。全球癌症观察站:肺癌。访问日期:2024 年 12 月。 2 美国癌症协会。肺癌的关键统计数据。访问日期:2024 年 12 月。 3 Chen R 等人。J Hematol Oncol。2020:13(1):58。 4 Majeed U 等人。J Hematol Oncol。2021;14(1):108。 5 Pircher A 等人。抗癌研究。2020;70(5):287-294。 6 Mito R 等人。Pathol Int。2020;70(5):287-294。 7 美国癌症协会。非小细胞肺癌的靶向药物治疗。访问日期:2024 年 12 月。 8 Rodríguez-Abreau D 等人。Ann Onc。 2021年7月;32(7):881-895。
资本化疲软 - 该公司报告了2021财年和2022财年连续两年的损失,这导致其净资产下降到卢比。20222年3月31日,其报告的齿轮增加到31.6倍。ASA印度报告截至2022年3月31日,射射也为5.73%,违反了15%的最低监管要求。但是,随着公司报告的2023财年和H1财年的利润以及风险加权资产的下降(RWA),CRAR提高到23.92%,截至2023年9月30日,截至2023年9月30日。尽管如此,净资产的盈利能力和提高净值取决于果阿收据的量子和时间。任何延迟或预期的回收率都会对盈利能力和净资产产生不利影响。
(e)“已知的地热资源领域”是指在秘书看来,地质,附近的发现,竞争利益或其他迹象将使人们对在主题中经历过的男人的信念,即在主题中经历过的男人,即在地理热蒸汽或相关的地热资源中的出现前景,足以为这一目的提供足够的费用。sec。3。Subject to the {provisions of section 15 of this Act, the Secre- tary of the Interior may issue leases for the development and utiliza- tion of geothermal steam and associated geothermal resources (1) in lands administered by him, including public, withdrawn, and acquired lands, (2) in any national forest or other lands administered by the Department of Agi-iculture through the Forest Service, including pub- lic, withdrawn,并收购了土地,(3)在美国所传达的土地上,但要保留向美国的地热蒸汽和相关的地热资源保留。
5 AV, LLC (3/06)(已于 2025/1/8 撤回) Roy R. Lustig,受托人(5/10)(已于 2025/1/8 撤回) The Battery Group LLC (11/10)(已于 2025/1/8 撤回) Lubavitch Center Aventura South (9/12) Royal Senior Care, LLC Salo Wagenberg,受托人 ColFin Aventura Funding LLC Gary Cohen,受托人/Two Islands (10/14)(已于 2025/1/8 撤回) Prive Developers, LLC/Gary Cohen (01/15)(已于 2025/1/8 撤回) Aventura Corporate Center, LLLP (06/16)(已于 2025/1/8 撤回) PBS Aventura, LLC (03/17)(已于 2025/1/8 撤回) Harry's Pizzeria III, LLC (04/17) (已撤回 2025/1/8) TV 109 LLC 和 TV 111 LLC (3/18) (已撤回 2025/1/8) Belmont Village LP (6/18) (已撤回 2025/1/8) Aventura Dixie LLC (7/20) Jasmin Investments LLC (7/20) Aventura North Distrikt Developments LLC (11/2020) Miami Off Center Associates, LLP (1/2022) (已撤回 2024/11/14) GOT183, LLC (1/2022) (已撤回 2025/1/8)
图 16-1。威廉 J. 休斯技术中心组织结构图 1600. 概述 1601. 使命 1602. 组织结构图 1603. 职能 1604. 授权 1605. 授权限制 1606. 特殊关系 1607. 保留 1608. 主任办公室 1609. 参谋长 1610. 评估和规划人员 1611. 已撤回 - CHG 31 1612. 医务现场人员 1613. 助理总法律顾问 1614. 民航安全人员 1615. 民权人员 1616. 保留 1617. 已撤回 - CHG 31 1618. 人力资源管理司 1619. 已撤回 - CHG 27 1620. 财务管理司 1621. 已撤回 - CHG 31 1622. 物流司 1623.撤回 - CHG 27 1624. 信息技术和服务部 1625.-1626. 保留 1627. 空中交通管制(ATC)工程和测试部 1628.-1634. 撤回 - CHG 31 1635.-1639. 保留 1640.-1643. 撤回 - CHG 31 1644.-1649. 保留 1650. 撤回 - CHG 31 1651.-1652. 保留 1653.-1655. 撤回 - CHG 31 1656.-1659. 保留 1660. 通信/导航/监视(CNS)工程和测试部 1661.-1664. 撤回 - CHG 31 1665.-1669.保留 1670. 已撤回 - CHG 31 1671.- 1674. 保留 1675. 设施管理部
与阿肯色州公用事业(Swepco)和法耶特维尔(Fayetteville)这样的城市(如Fayetteville)设定了在未来几十年中达到100%清洁能源的目标,Miso Queue queue持有的积极可再生能源项目。然而,由于误差区域网格的大块网格缺乏网格能力可能会导致较高的互连成本2对于廉价,可再生电力来源的开发人员(例如阿肯色州的太阳能农场),他们将项目提交给Miso排队。•在过去的四年中,计划为阿肯色州计划为阿肯色州的37个太阳能,风能,电池存储和混合太阳能存储项目被撤回。•如果开发,这些撤销的项目将提供近4,080兆瓦的清洁能源,足以为超过756,000户房屋供电。3•他们将在阿肯色州创造11,800个工作。4清洁能源工作的中位工资约为每小时24.50美元。•在与MISO Power Grid相关的所有15个州中,阿肯色州在密歇根州和明尼苏达州之后,阿肯色州排名第三。•阿肯色州仍然有30个可再生能源项目活跃在误会中,如果建造,它们将提供3,187兆瓦的清洁能源。
路易斯安那州州长最近成立了一个气候倡议工作组,目标是到 2050 年将该州的温室气体排放量削减至净零 ,MISO 队列中活跃的可再生能源项目大有希望。然而,许多项目被撤回,因为 MISO 区域电网大部分区域缺乏电网容量,这会导致向 MISO 队列提交项目的廉价可再生电力开发商(如路易斯安那州的太阳能发电场)的互连成本非常高 2 。 • 在过去四年中,总共有 31 个计划在路易斯安那州实施的太阳能、风能、电池储能和混合太阳能储能项目从 MISO 队列中撤回。 • 如果这些撤回的项目得到开发,将提供近 3,440 兆瓦的清洁能源,足以为超过 615,000 户家庭供电。 3 • 它们将在路易斯安那州创造约 10,400 个就业岗位。 4 清洁能源领域工作的平均工资约为每小时 24.50 美元。 • 在接入 MISO 电网的所有 15 个州中,路易斯安那州的清洁能源项目撤回数量排名第四,仅次于密歇根州、明尼苏达州和阿肯色州。 • 路易斯安那州仍有 49 个可再生能源项目在 MISO 队列中活跃,如果建成,将提供 6,714 兆瓦的清洁能源。