1准确性声明4 2执行摘要5 3上下文,范围和理由8 3.1简介8 3.2 Worsley氧化铝项目和修订的提案的描述8 3.3目的9 4 GHGMP组件11 4.1 GHG排放估算估计11 4.2降低排放量15 4.3减少量尺寸。 2) 26 4.5 Alternative Abatement Options 32 4.6 Mitigation Measures Adopted –Scope 3 Emissions 32 4.7 Other Applicable Statutory DECISION-MAKING Processes 33 4.8 Consistency with Other Non-Statutory GHG Reduction Tools 33 4.9 Offsets 34 4.10 Operations Beyond 2050 34 5 Adaptive Management, Continuous Improvement and Review 35 5.1 MA5 - Adaptive Management Approach 35 5.2 Review and Revision of GHGMP 35 6报告和公共披露37 7利益相关者咨询39 8参考40 9定义,条款和缩写42 10文件控制43 11附录44
Contact: Gavin Edwards - Director Email: gedwards@prestonconsulting.com.au Website: www.prestonconsulting.com.au Phone: +61 488 737 273 Street Address: Level 3, 201 Adelaide Terrace, East Perth, Western Australia, 6004 Postal Address: PO Box 3093, East Perth, Western Australia, 6892 Disclaimer This Report has been prepared on behalf of and为了独家使用Albemarle Lithium pty Ltd,并应根据Preston Consulting Pty Ltd和Albemarle Lithium Pty Ltd. Preston Consulting Pty Ltd的协议承担并发行,并承担任何第三方报告或对本报告的使用或对任何对任何第三方的使用或对任何使用的责任或依赖的责任或责任。未经Preston Consulting Pty Ltd和Albemarle Lithium Pty Ltd的明确许可,复制本报告的任何部分。
DC Water 的无铅 DC 计划旨在实现一项雄心勃勃的目标,即到 2030 年公平地拆除所有铅服务线。自 2019 年以来,我们更多地了解了整个特区的铅服务线位置、如何高效地完成全区范围内的铅服务线拆除,以及与客户就更换计划进行沟通的有效方式。我们利用这些经验教训修订了 2021 年铅服务线更换计划,以确保我们在 2030 年前拆除和更换特区内的每一条铅服务线。在该计划中,我们描述了最近的现场调查和更换工作的结果如何促使我们重新评估原始服务线清单的准确性。我们仔细检查了用于制定初始清单的所有数据源,并将特区内的所有服务线分类为已验证的铅服务线、疑似铅服务线、无信息(没有管道材料记录的服务线)、疑似非铅服务线和已验证的非铅服务线。此更新的库存分类系统为 DC Water 在估计特区内剩余的铅服务线时提供了更高的置信度。为了最终确定可疑的服务线是铅还是非铅,我们正在调查和验证任何被归类为可疑铅、可疑非铅或没有信息的房屋的服务线材料。在我们将要调查的房屋中,我们估计其中大约有 42,000 所房屋需要更换。随着我们在现场了解更多信息,我们将更新清单并在 Lead Free DC 网站上实时与公众分享。
