使用EEOP计算工作表来计算外部能源使用和可再生能量偏移。请按照链接以获取有关如何使用计算工作表的详细说明。**所有EEOP费用,如果没有完全抵消,则必须在TCO或CO之前支付新的建筑,并在最终检查之前进行添加/改建。EEOP计算工作表的缩写表格 - 性能的评估,可衡量系统使用能量ASHP-空气源热泵的有效程度。 系统从外面吸收热量并将其释放到GSHP地面源热泵中。 System that uses the ground's natural heat for heating and cooling kW- kilowatt is a unit of power that measures how much electricity is being used at a specific moment NERC- North American Electric Reliability Corporation IEEE- Institute of Electrical and Electronics Engineers AHRI- Air Conditioning, Heating, & Refrigeration Institute Standard Performance method ISO- International Organization for Standardization Btu- British thermal unit, used to measure the amount of heat in fuels and energy sourceEEOP计算工作表的缩写表格 - 性能的评估,可衡量系统使用能量ASHP-空气源热泵的有效程度。系统从外面吸收热量并将其释放到GSHP地面源热泵中。System that uses the ground's natural heat for heating and cooling kW- kilowatt is a unit of power that measures how much electricity is being used at a specific moment NERC- North American Electric Reliability Corporation IEEE- Institute of Electrical and Electronics Engineers AHRI- Air Conditioning, Heating, & Refrigeration Institute Standard Performance method ISO- International Organization for Standardization Btu- British thermal unit, used to measure the amount of heat in fuels and energy source