Development The development consists of the construction of an extension to an existing wastewater treatment plant (WWTP) where the works include:- A) Demolition of an existing storage building (17.50m2) and construction of a new single- storey industrial type building to enclose the DAF unit granted planning permission under planning reference LB180300 and to provide new enclosed storage and control rooms (total floor area 119m2).b)在进气口时安装新的污泥按压,将曝气罐更改为缺氧罐,安装2号。其他曝气箱,对周边护堤的改建,以将WWTP的足迹增加539m2,并在规划许可LB180300的规划许可下获得了计划许可。C) Treated wastewater rising main from the site of the proposed development to new discharge point at the River Boyne (distance 7.2km), where pipeline shall be laid along a section of Windmill Road, the L1013, Yellow Furze Road, the L1600 (Boyne Road), and the unnamed local road leading from the L1600 to the private lands abutting the River Boyne at the discharge point.此计划申请伴随着环境影响评估报告(EIAR)和Natura Impact声明(NIS)。
6.0 Screening .......................................................................................................... 21
但是,正如我们在会议期间所指出的那样,我们的担忧集中在该战略的有效性和合理性上,因为理事会目前无法确定足够的房屋以满足已提交的计划中的住房需求,而不足为2040年的882套房屋。在我们检查计划中任何站点的健全性或理事会住房轨迹的稳健性之前,存在此短缺。我们注意到,理事会认为在计划期间内的住房短缺可以通过增加的意外津贴来部分降低,但我们不相信理事会提出的修订后的意外收跌率是合理的,或者将在计划期间设想的利率继续下去。这是因为修订后的意外收获率是基于理事会没有最新的地方计划的时期,并且在决策中采用了框架中规定的可持续发展的推定。
1.0简介................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 3
Inspection Checklist ...................................................................................................................................................... 7 Starting Configuration Inspection ................................................................................................................................ 7 Expansion Limit Inspection ........................................................................................................................................... 8 Robot Signs .................................................................................................................................................................... 9 Robot Safety Inspection ................................................................................................................................................ 9 Inspection Troubleshooting ....................................................................................................................................... 10 End of the Day ............................................................................................................................................................. 10
5.0 政策背景 ................................................................................................................ 8
理事会................................................................................................................. 7