1,根据临时反馈和发出的初步评估,DHLGH从DHLGH收到了修订的提交。2 5月29日,从国家公园和野生动物服务部收到了较晚的提交。
Onshore Renewables ➢ Commence RESS 5 Auction, review of RESS, and commence design of new scheme ➢ Finalise ARET 2025 Work Programme ➢ Operation of Small-Scale Renewable Electricity Support Scheme ➢ National Planning Framework (DHLGH), Wind Guidelines (DHLGH), commence Regional Renewable Electricity Strategies ➢ National mapping of Renewable Electricity Areas and commence work on designating Renewable Acceleration Areas (RED III) Electricity Grid ➢ Private Wires Policy Framework ➢ LEU Scenarios from EirGrid ➢ Working Group report on barriers to gird projects and proposed solutions ➢ 2 * Quarterly reports on progress of key reinforcement projects ➢ Transposition of RED III on faster connection of renewables, and heat pumps
1 DHLGH Report of Expert Group for the First Revision of the National Planning Framework: gov - Report of Expert Group for the First Revision of the National Planning Framework (www.gov.ie) 2 OECD Redesigning Ireland's Transport for Net Zero: https://www.oecd.org/en/publications/redesigning- ireland-s-transport-for-net-zero_b798a4c1-en.html 3 CCAC Annual Review 2024 – Built Environment: https://www.climatecouncil.ie/councilpublications/annualreviewandreport/AR2024-Built%20Environment.pdf 4 Data on these trends is available in an online tool which presents all of the local authority core针对实际施工趋势的每个定居点的战略住房目标。请参阅:住房交付跟踪器
“水农业”欧洲创新合作伙伴农业项目《水农业(FFW)项目》是欧洲农业生产力和可持续性(EIP-AGRI)的一项新倡议。这个雄心勃勃的项目旨在应对水质挑战,同时带来额外的环境利益。ffw促进了农民,研究人员,政策制定者和其他利益相关者之间的合作,以共同开发和完善创新的解决方案。通过关注实用和可扩展的措施,该项目旨在提高水质并促进可持续的农业实践。水EIP旨在提高本地,集水区和国家水平的水质。农业,食品和海洋(DAFM)和欧洲委员会(EC)提供了5000万欧元,该欧元是为农民支付的围栏,以在监管要求之上实施目标行动。住房部,地方政府和遗产(DHLGH)为该项目提供了1000万欧元的行政支持。地方当局水域计划(Lawpro)与Teagasc和Ireland(DII)合作领导了这项倡议。于2024年3月启动,该计划将运行到2027年,并由广泛的合作者网络(包括农民,研究人员,地方当局和其他主要利益相关者)提供支持。
简介“所有人的住房 - 爱尔兰的新住房计划”是政府的住房计划,直到2030年。这是一项多年的数十亿欧元计划,它将改善爱尔兰的住房系统,并为拥有不同住房需求的人们提供更多类型的房屋。政府的总体目标是,该州的每个公民都应使用高质量的房屋以负担得起的价格购买或租用,以高标准建造,并在正确的地方,提供高质量的生活。提供新的社会和负担得起的房屋是该计划的关键优先事项,将构成整体住房交付的重要组成部分。作为所有计划的住房的一部分,Fingal County Council制定了该住房行动计划2022-2026,介绍了时间范围的社会和负担得起的住房交付的详细信息。住房行动计划详细介绍了未来5年的社会和负担得起的房屋的交付。该计划总结了当前和预计的住房交付,该计划将交付以满足部门住房设定的目标。地方政府和遗产(DHLGH)用于在Fingal提供新建社会住房。
正在进行 正在进行 正在进行:2023 年 12 月,根据欧盟化学品可持续发展战略,委员会通过了三项立法提案,旨在:简化欧盟立法中化学品的评估;加强化学品知识库;确保及早发现和应对新出现的化学风险。DETE、HSA、DAFM 和 DECC 将在 2024 年参与理事会工作组的谈判进程。就 REACH 对微塑料的限制开展了跨部门/机构合作工作,并根据《化学品法》进行了修订,以指定 DHLGH 为执行“枪弹中的铅”REACH 限制的主管当局。DECC 和 EPA 还为 REACH 委员会每月的 REACH 授权和限制提案会议提供了意见。DECC 和 EPA 于 2023 年定期举行化学品双边会议,讨论汞、持久性有机污染物和其他化学品问题的实施,EPA 参加了欧盟持久性有机污染物主管当局小组的两次会议。英国能源与气候变化部参加了 2023 年 5 月在日内瓦举行的《巴塞尔公约》(COP 16)、《鹿特丹公约》(COP 11)和《斯德哥尔摩公约》(COP 11)三国缔约方会议。英国能源与气候变化部和美国环保署在 2023 年 11 月举行的《关于汞的水俣公约》第五次缔约方会议(COP-4.2)上提前提出了欧盟立场,美国环保署和美国卫生科学局于 2023 年 10 月举行了一次关于化学品的国际会议。
ABP An Bord Pleanála ACA Agricultural Consultants Association AD Anaerobic Digestion AFIR Alternative Fuels Infrastructure Regulation BnM Bord na Móna BCP Broadband Connection Point BER Building Energy Rating BEREC Body of European Regulators for Electronic Communications BIK Benefit in Kind BIM An Bord Iascaigh Mhara CADB Climate Action Delivery Board CAP Climate Action Plan CAP Common Agricultural Policy CARO Climate Action Regional Office CC23 Climate Conversations 2023 CCCC Climate Communications Coordination Committee CCAC Climate Change Advisory Council CCMA County and City Management Association CCIM Climate Change in the Irish Mind CCS Carbon Capture and Storage CECLT Citizen Engagement and Climate Literacy Taskforce CEP Clean Export Premium ComReg Commission for Communications Regulation CRU The Commission for Regulation of Utilities KIC Knowledge and Innovation Community (KIC)二氧化碳二氧化碳CO2EQ。二氧化碳等效的CSO中央统计办公室CSP共同的农业政策战略计划DART都柏林地区快速运输Daera农业,环境和农村事务部(英国)DAFM农业,食品和海洋士兵部儿童平等,残疾人,整合,整合,整合和及环境和通信的dafm农业,食品和海洋士兵部门,环境和通信,及环境和通讯,并将 Science DETE Department of Enterprise, Trade, and Employment DFA Department of Foreign Affairs D/FIN Department of Finance D/Health Department of Health DHLGH Department of Housing, Local Government, and Heritage D/Transport Department of Transport DPER Department of Public Expenditure and Reform DMURS Design Manual for Urban Roads and Streets DRCD Department of Rural and Community Development DSP Department of Social Protection D/Taoiseach Department of the Taoiseach DTCAGSM Department of旅游,文化,艺术,盖尔塔特,体育和媒体EDRRS增强了退役,康复和恢复计划EGFSN未来技能的专家小组,需要EI Enterprise Ireland Ireland Eip Eroper Euroland Innovation Innovation Enerovation eit Eutor欧洲欧洲创新与技术EMRA EMRA东部和Midland Regional Regional Indortional Institute
背景生活计划是欧盟在环境领域资助项目的主要机制之一,在实施主要欧盟立法(例如栖息地和鸟类指令)中起着重要作用。住房,地方政府和遗产部(DHLGH)的国家公园与野生动物服务局(NPWS)与农业,食品,粮食和库尔特性质部合作,获得了3,39万欧元的生活战略项目(SNAP),授予了339万欧元的资金。该项目计划运行到2032年12月31日。Life Snap Ireland项目具有三个支柱结构。支柱是核心支柱,并解决了识别,整理,分析和共享与国家一级自然保护和恢复有关的所有数据的战略需求。Life Snap Ireland Pillar One将建立一个“综合数据平台”的保护措施,该数据存储库将作为决策支持机制,以使标准化的国家方法能够对保护措施的优先级,监控和报告。支柱二是“恢复”支柱,将集中于直接实施恢复措施,最初特别强调泻湖和pafor虫的泥炭地,随后介绍了在Pillar One下确定的其他保护优先级。支柱第三将建立一个“国家互补资金单位”,以协调和动员资金以恢复措施,这些措施在支柱一号下确定并在第二个支柱下交付。他/她将直接负责跨职能项目团队的管理。它还将寻求最大限度地利用主流生物多样性优先级为国家和欧盟资助机制提供生物多样性的资金。该项目将由一个多学科的14人项目团队实施,负责在NPWS的指导下实施Life Snap Ireland。项目团队将由项目经理,项目管理员,助理经理(生态),助理经理(ICT/数据)保护计划协调员,项目生态学家,泻湖专家,补充资金生态学家,数据中心GIS GIS官员X 2,数据分析师,数据分析师,数据工程师和数据架构师。职位描述被任命为“生命快照爱尔兰项目经理”的人将负责管理和协调欧盟生活项目“爱尔兰的生命战略自然项目”。项目经理将负责执行项目行动,包括协调项目合作伙伴要提供的那些行动,并提供预期的结果。他/她还将直接领导第三支柱的实施 - 建立补充资金单位。