NGCP与King Energy Generation,Inc。(Kegi)(Misamis coptiental Power厂3)(MOPP 3)的辅助服务采购协议(MOPP 3) - 日期为2023年8月15日的ERC命令中的Misamis Occidental,能源监管委员会(ERC)与NGCPENT ASPERS PRECTER PRECTER PRECTER(ERC)一致(ERC)批准了ASPAR的临时权威( (Kegi),案卷为ERC案号2023-084 RC,题为“在援助辅助服务采购协议申请的申请中(Misamis coctiental Power厂3),菲律宾国家网格公司(NGCP)和国王能源生成公司(NGCP)和国王能源生成公司(INCGI)(KEGI)(KEGI)(KEGI),并祈祷为国王(National of National of National of National of National of National of National of National of National of National of National of National grids grids grid of the grid of the grid of the: Generation,Inc。(Kegi)被授予临时权力,以实施其辅助服务采购协议(ASPA),以达到位于BRGY的Misamis Occidental Power Pertant 3(MOPP 3)的16.239MW容量。San Isidro, Jimenez, Misamis Occidental, subject to the following rates and conditions, and without prejudice to the evaluation of the compliance of NGCP to the Ancillary Service-Competitive Selection Process (AS-CSP), pursuant to the Department of Energy's (DOE) Department Circular No.DC2021-10-0031 1(DOE 2021 AS- CSP圆形):1。适用的费率:Kegi应为可调度储备(DR)(DR)的适用费率(每小时每小时每小时的PESO)收取,而每次发生反应性电源支持(RPS)的情况,如下所示。ASPA附表1中指示的辅助服务(AS)是小时的公司容量。1.1。适用的费率应如下:无需能源派遣的NGCP的预定容量应为附表1中指定的计划容量支付适用的费率,该费率不应大于DR的指定容量15.5MW。授权费率如下: