1.1 概述。陆军飞机部件的作战要求最终源自指定性能标准的 eser。这些性能标准中经常包括部件在特定诱导和自然环境下按照其设计规格运行的能力。为了获得最佳结果,战斗/物资开发人员应生成生命周期环境概况 (LCEP),以定义部件在其使用寿命期间将暴露的最极端环境压力源或环境压力源组合。LCEP 支持用户指定的性能标准,从而影响部件开发过程的设计和测试阶段。MIL·STD-810,任务 402(生命周期环境概况 (LCEP))详细解释了此过程。在完成部件 LCEP 的工程设计阶段后,将对部件进行特定的环境测试,以验证设计是否满足 AR-70-62 中定义的预期性能和适航性/资格要求。本 ADS 的主要目标是定义环境要求。在鉴定方法中,首选的是测试,但其他方法如相似性或分析也被接受。
Standard Plan J-10.25-01 Transformer Cabinet (480V/240V - 240V/120V) : Standardized the design regardless of input and output voltages, removed the secondary main breaker to allow for full use of the 12-position breaker panel, added the option for inclusion of a lighting circuit (including photocell), and added a surge protection device to allow for direct wiring of Variable Message Signs (we will no longer receive a load center in a VMS cabinet, removing the need for a specialized VMS cabinet). Standard Plans J-20.01-01 Light and Signal Standard Index and Identification , J-21.10- 05 Type PS, Type 1, RM & FB Signal Standard Foundation Details, J-21.16-02 Flashing Beacon Type 1 Signal Standard Details, J-22.15-03 Ramp Meter (Type RM) Signal Standard Details, J-22.17-00 Ramp Meter Signal Installation Details (New Plan) - This block of plans has been revised to accomplish two things: 1. Slip-base foundations are being replaced with frangible bolt installations. This allows us to use one base plate, anchor bolt arrangement, and foundation design for both fixed and breakaway poles, with the only difference being the inclusion of breakaway bolt connections (ex: Transpo Pole-Safe), and for any site to be breakaway without significant modifications. Slip base pole drawings will be retained internally to support ordering maintenance spares, but all new construction will be square base plates. 2. Simplify the number of pole types. To reduce the number of pole types, omit duplicate information, and make the types more clear, the short vertical poles have been revised into four basic setups: PS (8 ft, square base), RM (8 ft, triangle base), I (10 ft, square base), and FB (15 ft, square base). To support this, J-22.17 was split out as a separate plan for Type I Ramp Meter Signal installations as it uses different pole types for different base configurations – J-22.15 was reduced to just the Type RM pole itself (no foundation or base details). Standard Plan J-20.05-00 Pedestrian Pushbutton (PPB) Location and Orientation (New Plan) - This is a new plan that shows proper field placement and orientation of accessible pedestrian pushbuttons. This had been in the works for a while, but the pending requirement that all PPBs be accessible (not necessarily APS) pushed this to the top of the list. Along with pending Design Manual revisions (1330 and 1510), this will now be an issue for flashing beacon systems (including RRFBs). Standard Plan J-20.15-04 Accessible Breakaway Pedestrian Pushbutton (PPB) Post - Breakaway PPB Post: Revised to show both a flat and curb based installation. The fixed base version has been deleted and will no longer be allowed for new construction. Standard Plan J-28.30-04 Steel Light Standard Foundation Types A & B - Per discussions with maintenance, we are moving the supplemental ground connection so that it only bonds the pole anchor bolts to the foundation reinforcing steel. This will perform the same function as the previous setup that connected the reinforcing steel to the ground lug in the pole while remaining intact in case of a knockdown (typically the current design is sheared and no longer usable).
条款 条款标题 1 解释 2 关系和沟通 3 与第三方合作 4 财务披露和风险 5 平等和多样性 6 标识和营销 7 您的义务、照顾客户、合规和自我监控 8 保存记录以及填写和返回表格 9 提供信息和进入您的场所 10 合同工作标准 11 KPI 12 合同文件和优先权 13 合同文件的修订 14 您在我们这里的账户、索赔、付款和评估 15 保密性 16 数据保护 17 FOIA 18 保证 19 赔偿 20 发出通知 21 您必须告诉我们的事情 22 合同变更和合格事件 23 贿赂、串通、虚假投标、欺诈和不道德行为 24 制裁 25 本合同如何终止 26 终止的后果 27 重新考虑决定和审查程序 28 争议解决 29 适用法律和管辖权 30 一般规定
2.1 药物管理 ................................................................................................ 2-1 2.2 酒精和自行服用的药物 ................................................................................ 2-1 2.3 免疫程序 ........................................................................................................ 2-1 2.4 献血 ................................................................................................................ 2-1 2.5 低压舱暴露 ...................................................................................................... 2-2 2.6 离心机暴露 ...................................................................................................... 2-2 2.7 模拟器训练 ...................................................................................................... 2-2 2.8 潜水、高压暴露 ................................................................................................ 2-2 2.9 剧烈体力活动 ................................................................................................ 2-3 2.10 接触化学武器药剂模拟物................................................ 2-3 2.11 眼科检查................................................................................ 2-3
了解如何在DEAP计算并输入居住的热量损失,如何在车库,楼梯间,屋顶上的房间,屋顶房间,进入走廊,学校,音乐学院和其他大型玻璃区域都会影响ber的意义,在deap中不同的undept eap deap的不同建筑物的u-u-Value的重要性,例如,在较大的境界中,或者是较大的区域的一部分,或者是在较大的境界中的一部分。空间,窗帘壁系统的输入和DEAP中的玻璃砌块,使用DEAP桌子的各种类型的墙壁,屋顶,地板,窗户和门的默认U值以及如何将默认设置调整为改进的建筑元素的更准确值。了解何时将地下室包括或排除在BER中,以及如何计算地下室的热量损失。描述了不透明元件的TGD部分L的所有修订中指定的热损耗限制。
应用程序:请参见 DASE 应用程序。 应用程序中止:请参见应用程序终止。 应用程序激活:将应用程序的生命周期状态从初始化状态转换为活动状态的过程,此过程需要解码应用程序初始实体。 应用程序交付系统:一种宣布和发送应用程序并将其资源交付给应用程序环境的机制。 应用程序交付文件系统:应用程序交付系统提供的可选文件系统;应用程序交付文件系统可以安装(逻辑连接)到本地文件系统的目录;通常,应用程序交付文件系统的所有节点(目录和文件)都被限制为仅支持读取访问。 应用程序发射器:通过应用程序交付系统实施的机制控制应用程序发射的实体;例如,地面广播公司。 应用程序实体:表达应用程序某些部分的信息单元。 应用程序实体集合:表达整个应用程序的应用程序实体集合。
一般要求 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 进料 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 制造商的责任 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 检验程序 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 取样方法 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 检验阶段 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 检验顺序 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 缺陷材料—取样 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 缺陷材料—加工 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 详细要求 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 集装箱内容 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 一般要求 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 检验范围 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 缺陷墨盒 _ _ _ _ _ _ _ _ _ _ _ _ _ 严重 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 重大和轻微 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 工艺损坏 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 纸箱包装 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 密封前 _ _ _ _ _ _ _ _ _ _ _ _ _ _ 可接受的质量水平 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 缺陷分类 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 视觉标准 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 防水信封 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 密封前 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 可接受的质量水平 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 缺陷分类 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 视觉标准 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 大包装 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 可接受的质量水平 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 缺陷分类 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 视觉标准 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 剪贴包装 _ _ _ _ _ _ _ _ _ _ _ _ _ _ 可接受的质量水平 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 缺陷分类 _ _ _ _ _ _ _ _ _ _ _ _ _ _ 视觉标准 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 金属链带包装 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 前代设计 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 断裂或软链环 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 扭曲测试 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 拉力测试 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 柔韧性测试 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ i v
4. 一般要求 14 4.1 联合采购 1-4 4.2 北大西洋公约组织 (NATO) 采购 14 4.3 设计要求 1-4 4.3.1 过滤(仅限海军) 14 4.3.2 使用电爆炸装置 (EED) 的设备或子系统 1-4 4.3.2.1 空军采购 1-4 4.3.2.2 海军采购 1-5 4.3.2.3 陆军采购 1-5 4.4 自兼容性 1-5 4.5 商用现货设备 1-5 4.5.1 用于设备或子系统 1-5 4.5.1.1 由承包商选择 1-5 4.5.1.2 由采购活动指定 1-5 4.5.2 用作单个设备 1-5 4.6 政府提供的设备(GFE) 1-5 4.7 短时辐射 1-5 4.8 采购满足其他 EMI 要求的设备和子系统 1-5 4.9 测试要求 1-5