环境是由直接或间接影响人类活动引起的任何形式或精力引起的:人口的安全,安全和福祉; II-社会和经济活动; iii-生物群; iv-环境的美学和卫生条件; V-环境资源的质量”。In accordance with item VII of Article 1 of the Convention on Transpact Environmental Impact Evaluation, which was signed on February 25, 1991 in Sport/Finland, and adopted under the United Nations Commission, environmental impact is “any effect of a proposed environmental activity, notably on health and safety, flora, fauna, soil, air, water, the climate, the climate, the water, the climate, the climate, the water, the water, the气候景观和历史古迹或其他结构或这些因素之间的相互作用”In accordance with item VII of Article 1 of the Convention on Transpact Environmental Impact Evaluation, which was signed on February 25, 1991 in Sport/Finland, and adopted under the United Nations Commission, environmental impact is “any effect of a proposed environmental activity, notably on health and safety, flora, fauna, soil, air, water, the climate, the climate, the water, the climate, the climate, the water, the water, the气候景观和历史古迹或其他结构或这些因素之间的相互作用”
本文件中的信息可能会发生变化,不应视为对任何人的建议。本文件不以任何方式约束能源市场管理局对任何事项授予任何批准或官方许可,包括但不限于授予任何豁免或任何豁免条款。能源市场管理局保留在不事先通知的情况下更改其政策和/或修改本文件中任何信息的权利。如果个人对本文件中的信息可能如何影响他们或其商业活动存在疑问,建议他们寻求独立的法律建议或他们认为适当的任何其他专业建议。能源市场管理局对任何人因使用或依赖本文件中的任何信息而直接或间接造成的任何后果(财务或其他)或任何损害或损失不承担任何责任。
2关于加速陆上电力传输投资的决定| OFGEM 3英国能源安全策略-Gov.uk(www.gov.uk)4法定咨询,以修改电力传输许可中的特殊许可条件:加速战略传输投资| OFGEM 5决定在电力传输许可中修改特殊许可条件:加速战略传输投资| Ofgem 6我们决定的第3.43段。7价格控制可交付的报告要求和方法论| Ofgem
1 SCE 不保证客户会收到通知。SCE 不承担与向客户通信设备发送事件通知相关的服务提供商费用。2 根据加州公用事业委员会 (CPUC) 的指示,SCE 在 TOU-BIP 计划关税中设置了兆瓦 (MW) 上限,这可能会限制注册。3 如果您符合条件,SCE 将为电表提供一些限制。4 由加州公用事业委员会 (CPUC) 在决议 (D.) 16-09-056 中指示。