案卷号:ER10-1962-028; ER10-1966-023; ER10-1899-023; ER10-1907-031; ER10-1918-032; ER10-1930-019; ER10-1931-020; ER10-1932-022; ER10-1935-023; ER10-1950-032; ER11-2642-027; ER11-3635-021; ER12-895-032; ER13-2112-023; ER14-21-017; ER14-2138-019; ER15-2601-015; ER16-1872-022; ER16-2275-022; ER16-2276-022; ER18-1535-014; ER18-1771-022; ER18-2003-018; ER18-2246-021; ER19-1392-012; ER20-2019-011; ER20-2064-012; ER20-2690-013; ER21-1953-011; ER21-2117-010; ER21-2149-010; ER22-2536-006; ER11-2160-028; ER12-1228-034; ER12-2225-022; ER12-2226-022; ER13-2147-009; ER14-1630-019; ER14-2447-003; ER14-2707-029; ER15-1375-022; ER15-2101-017; ER15-2477-021; ER16-90-021; ER16-1354-017; ER17-2340-018; ER18-2066-013; ER18-2182-019; ER19-2389-013; ER19-2398-017; ER20-1907-011; ER20-2695-013; ER21-254-009; ER21-2225-010; ER21-2699-011; ER22-1982-009; ER23-2629-004; ER24-827-002; ER24-2512-001; ER24-2514-001; ER24-1816-002; ER24-2513-001; ER24-2794-001; ER10-1857-022; ER10-1890-028 Applicants: FPL Energy Green Power Wind, LLC, FPL Energy Cape, LLC, Minco II Energy Storage, LLC, FRP Columbia County Solar, LLC, High River Energy Center, LLC, FRP Gadsden County Solar, LLC, FRP Gilchrist County Solar, LLC, Grace Orchard Energy Center, LLC, High Banks Wind, LLC, Great Prairie Wind,LLC,Minco Wind Energy III,LLC,Irish Creek Wind,LLC,Harmony Florida Solar,LLC,Mohave
档案编号:ER10-1849-035; ER10-1851-020; ER10-1852-107; ER10-1857-023; ER10-1890-030; ER10-1899-024; ER10-1907-032; ER10-1918-033; ER10-1930-020; ER10-1931-021; ER10-1932-023; ER10-1935-024; ER10-1950-033; ER10-1962-030; ER10-1966-024; ER11-2160-030; ER11-2642-029; ER11-3635-023; ER12-895-034; ER12-1228-036; ER12-2225-023; ER12-2226-023; ER13-752-023; ER13-1991-036; ER13-1992-036; ER13-2112-025; ER13-2147-010; ER14-21-018; ER14-1630-020; ER14-2138-020; ER14-2447-004; ER14-2707-031; ER15-1375-024; ER15-2101-018; ER15-2477-023; ER15-2601-016; ER16-90-023; ER16-1354-019; ER16-1872-023; ER16-2275-024; ER16-2276-024; ER17-2340-020; ER18-882-023; ER18-1534-016; ER18-1535-015; ER18-1771-023; ER18-2003-020; ER18-2066-015; ER18-2182-021; ER18-2246-022; ER19-1392-014; ER19-1393-020; ER19-1394-020; ER19-2269-012; ER19-2389-014; ER19-2398-018; ER19-2437-016; ER20-1907-013; ER20-1986-012; ER20-2019-013; ER20-2064-014; ER20-2690-014; ER20-2695-015; ER21-254-010; ER21-1682-008; ER21-1879-008; ER21-1953-012; ER21-2117-012; ER21-2118-011; ER21-2149-012; ER21-2225-012; ER21-2293-011; ER21-2296-011; ER21-2699-013; ER22-381-014; ER22-1982-011; ER22-2536-007; ER22-2706-007; ER23-1541-005; ER23-1542-005; ER23-1543-005; ER23-2321-004; ER23-2629-006; ER24-26-004; ER24-827-004; ER24-1289-004; ER24-1816-003; ER24-2512- 004; ER24-2513-004; ER24-2514-004; ER24-2662-002; ER24-2794-003 Applicants: Minco II Energy Storage, LLC, Duane Arnold Solar II, LLC, FRP Gadsden County Solar, LLC, FRP Columbia County Solar, LLC, FRP Gilchrist County Solar, LLC, High River Energy Center, LLC, Decatur Solar Energy Center, LLC, Grace Orchard Energy Center, LLC, East
1 Mill Pond Associates,Inc.,19 FERC¶62,045(1982)(命令授予豁免5兆瓦或更少的小型水电项目的许可)。随后,2013年2月27日,该项目被转移到Northwoods Renewables,LLC,并于2022年8月15日转移到Parker&Nelson Holdings,LLC。
该文档计划于20125年2月27日在联邦公报上发布,并在https://federalregister.gov/d/2025-03167上在线获取,并在https://govinfo.gov.gov
最近的许多ETARIFF申请包含带有OLE对象的关税记录(一个应用程序中创建的对象可以嵌入另一个应用程序中)。例如,某些文件包括打算是图片或行图,但实际上是嵌入式程序文件,.pdf文件和PowerPoint(.pptx)文件。自Etariff成立以来,委员会不允许在关税记录中使用嵌入式对象(当将这些关税记录作为.RTF文件提交时)。1个委员会员工正在努力创建一项支票,该支票类似地拒绝包含OLE对象的其他应用程序中的关税记录文件。
2。in No.901,根据FPA的第215(d)(5)条,委员会指示NERC向NEW或修改后的可靠性标准提交给注册IBR的新的或修改后的可靠性标准,除其他方面,以解决问题监控数据共享,绩效要求和事后绩效验证。5委员会指示NERC考虑IBR所有者的负担,以收集和提供由干扰监控设备收集的数据,同时确保批量功率系统运营商和计划者拥有所需的数据来准确进行干扰监控和分析。6委员会还指示NERC提交新的或修改后的可靠性标准,这些标准“要求发电机所有者与相关的计划协调员,传输计划者,可靠性协调员,传输操作员和平衡当局进行实际扰动后扰动率的速率平衡。” 7委员会指示NERC在2024年11月4日之前向委员会提交新的或修改的可靠性标准。8
该文档计划于20125年3月6日在联邦公报上发布,并在https://federalregister.gov/d/2025-03580上在线提供,并在https://govinfo.gov
太平洋天然气公司建议将下部的Feeley Lake Dam(Carr Lake)波峰恢复到其原始的设计高度,并相关的上游脚趾以及对上游坡度的保护增强。第39条所需的最小流量的差异是为了促进工作的必要条件。批准差异将使被许可人从下部的Feeley大坝释放的流量从每秒0.5立方英尺(CFS)目标的流量减少到0.4 cfs目标,并将允许的最小流量从0.2 cfs减少到0.1 cfs。所述的流量减少将于2025年6月1日至2025年11月30日发生。
Individually configured – A device has a combination of features, adjustments, or modifications specific to complex needs patient that a qualified complex rehabilitation technology supplier provides by measuring, fitting, programming, adjusting, and adapting the device as appropriate so that the device is consistent with an assessment or evaluation of the complex needs patient by a health care professional and consistent with the complex needs patient's medical condition, physical and functional needs and capacities, body size, period of need, and预期用途。
