a)招标者提交了CSD注册报告或注册号的副本(请参阅T2.1.12); b)招标者以适当的承包商分级名称在建筑行业发展委员会注册(请参阅T2.1.11); c)招标人或其任何董事/股东均未在招标违法者的登记册上列出2004年的预防和打击腐败活动法,因为禁止与公共部门开展业务; d)招标者已经完成了强制性企业问卷,没有利益冲突可能会影响招标者以雇主的最大利益履行合同的能力,或允许国家雇用的招标过程和雇用人员允许提交招标或参与合同(请参阅T2.1.14); e)招标人已注册,并在劳工部发行的薪酬基金(与Coida的良好信誉)中保持良好的信誉; f)雇主对招标人的2014年《职业健康与安全法》(1993年)的《 2014年建设法规》(1993年)的构建法规的统治很满意,这是安全执行工作的必要能力和资源。g)税收合规状态PIN或CSD报告的副本。h)工厂文件:承包商拥有的设备:必须提供注册文件。或要租用的设备(如果有):与首选租赁公司雇用的意向书(必须附上注册文件)
III. FUNDING: For Medicare Administrative Contractors (MACs): The Medicare Administrative Contractor is hereby advised that this constitutes technical direction as defined in your contract. CMS does not construe this as a change to the MAC Statement of Work. The contractor is not obligated to incur costs in excess of the amounts allotted in your contract unless and until specifically authorized by the Contracting Officer. If the contractor considers anything provided, as described above, to be outside the current scope of work, the contractor shall withhold performance on the part(s) in question and immediately notify the Contracting Officer, in writing or by e-mail, and request formal directions regarding continued performance requirements. IV. ATTACHMENTS: Business Requirements Manual Instruction
我们要求您在本备忘录发布后 5 天内指定两名联系人负责此次审计。一名联系人应为政府雇员(GS-15、薪级等级或军方同等职位),他们熟悉 F-35 飞行器维护合同。第二名联系人应为高级行政服务人员或将军/将官,他们熟悉维护合同,必要时可充当国防部监察长办公室高级领导的联络点。将每位联系人的姓名、职务、级别/薪级、电话号码和电子邮件地址发送至 audclev@dodig.mil。
107 There is no action, suit, proceeding, or investigation at law or in equity, before or by any 108 court or governmental entity, pending or threatened against Contractor, or otherwise 109 affecting Contractor, wherein an unfavorable decision, ruling, or finding, in any single 110 case or in the aggregate, would (a) materially adversely affect Contractor's performance 111 hereunder, (b) adversely affect the validity or本协议的可执行性,或(c)112对承包商的财务状况或实体113产生重大不利影响,提供承包商绩效的保证。
• Log into the HQR system using your HARP ID credentials and navigate through the steps listed below to download your HSR: - From the left-hand navigation menu, select “Program Reporting” - Then select “Measure details” - Here, you can view your hospital specific reports (HSRs) - Select the release year for your report (for example, select 2024 for the FY 2025 HSR), followed by the program in which you are interested (for example, HRRP)。在“报告”下,您可以看到可下载的文件列表(例如,HRRP HSR)。- 要下载文件,选择“导出”,将通过浏览器下载该文件。下载后,打开zip文件以查看您的网站的信息。
8.1 Attachment 1 - Health Declaration Form ....................................................................................... 15 8.2 Attachment 2 - Health Management Plan ...................................................................................... 16 8.3 Attachment 3 - Manual Task Risk Assessment............................................................................. 17 8.4 Attachment 4 - Process Flow Chart - Brisbane or Site Based Direct Employees - Medical Health Declaration ............................................................................................................................ 20 8.5 Attachment 5 - Process Flow Chart - Brisbane or Site Based Direct Employees - Full Health Assessment ...................................................................................................................................... 21 8.6 Attachment 6 - Process Flow Chart - Site Based Roles - Contractor Medical Health Declaration ........................................................................................................................................ 22 8.7 Attachment 7 - Process Flow Chart - Site Based Contractor Roles Full Medical...................... 23
《谈判真相法案》(TINA)于 1962 年颁布,旨在确保政府谈判人员能够获得报价人在制定提案时使用的成本或定价数据,从而帮助在单一来源合同(不存在价格竞争)中创造公平的竞争环境。在此案中,美国指控 PowerSecure 违反了《虚假索赔法案》,故意不披露成本或定价数据(TINA 要求),这些成本或定价数据与 PowerSecure 在飓风厄玛之后在佛罗里达州和乔治亚州的最近恢复项目中用于“大本营服务”的费率有关。美国进一步指控 PowerSecure 未能披露与劳动力和设备成本有关的成本或定价数据,违反了《谈判真相法案》。该和解解决了有关 PowerSecure 未能披露此信息导致美国陆军工程兵团同意提高劳动力、设备和大本营服务费率的指控。
2017 年秋季,美国国家安全局监察长办公室随后审查并比较了麦康伯在国家安全局的出入控制记录与 Info T eK 为她在 Ironbridge 合同中工作的时间,发现麦康伯在时间表上记录的 2,342.5 小时(90%)中,有 2,342.5 小时不在国家安全局米德堡地点的出入控制范围内,而 InfoTeK 随后将这一时间记入了国家安全局的账目中。除了在 Ironbridge 合同中她记入账目的绝大多数时间里,麦康伯并没有在工作现场工作,证据还显示,麦康伯的工作时间并没有达到她在时间表上记录的 Ironbridge 合同规定的小时数。例如,在麦康伯为 Ironbridge 合同记入整整八小时工作时间的情况下,她参加了慈善活动,参加了高中同学聚会,在德克萨斯州和马里兰州海洋城度假,并代表 Info T eK 开展了与 Ironbridge 合同无关的业务开发工作。 Info T eK 前官员的其他证词表明,麦康伯只是偶尔出现在 InfoTeK 位于马里兰州哥伦比亚的办公室,而且她在那里时似乎并没有处理与 Ironbridge 相关的事务。由于麦康伯谎报她在 2016 年 3 月至 2017 年 9 月期间为 Ironbridge 工作,美国国家安全局向 InfoTeK 支付了巨额报酬。
c)但是,如果第二燕麦失败(太阳能工厂和bess的燕麦(电池容量放电测试)),如果承包商需要更多时间以自行决定进一步采取纠正措施,那么BSPGCL可以允许BSPGCL对承包商进行此类oat oat to ant。battery(a)(a)(a)(a)(a aat aat aat aat aat aat aat aat aat aat aat aat aat and and oat bate&aat and oat bate&aat and and oat bate&b.b be)(best)。However, if the Contractor is successful in third attempt, then the penalty deducted at the time of unsuccessful 2nd attempt of OAT (a. OAT for Solar Plant & b. OAT for BESS (Battery Capacity Discharge Test)) shall be returned but if the Contractor fails in third attempt of OAT (a. OAT for Solar Plant & b. OAT for BESS (Battery Capacity Discharge Test)), then penalty charged at the time of second
CITY OF PHOENIX AVIATION DEPARTMENT Construction Safety Plan PHOENIX SKY HARBOR INTERNATIONAL AIRPORT 3400 Sky Harbor Boulevard Phoenix, Arizona 85034 ____________________________ ____________________________ Contractor Representative Design Construction Services Project Manager ____________________________ ____________________________ Airside Construction Coordinator Airside Superintendent Date:___________________