简介10 fortiClient EMS组件10文档12 BPS 13入门15开始管理Windows,Macos和Linux端点15最初将Forticlient软件部署到端点15将配置信息推向Forticlient 16 Forticlient 16的关系16 forticlient 16的关系16 forticlient的关系将个人资料部署到Chromebooks 21 21如何与Chromebook一起使用Chromebook 22安装准备23系统要求23系统要求23许可类型24 ForticLient EMS 24组件应用程序27所需的服务27所需的服务27遥测数据使用需求30管理能力30管理能力32在EMS和SQL No no no no no no no no fortere fortigate fortigate 33硬件33硬件33硬件时进行33硬件33硬件33的硬件。 FortiGate connected 34 Hardware configuration when there are FortiGates connected to the EMS 35 FortiClient Telemetry security features 36 Server readiness checklist for installation 36 Upgrading EMS 37 Upgrading from an earlier FortiClient EMS version 37 Auto upgrading EMS to latest patch release 39 Install preparation for managing Chromebooks 40 Google Workspace account 40 SSL certificates 41 Installation and licensing 42 Downloading the installation file 42 Installing FortiClient EMS 42 Installing FortiClient EMS to specify SQL Server Enterprise or Standard instance 44 Installing FortiClient EMS using the CLI 48 Allowing remote access to FortiClient EMS and using custom port numbers 50 Customizing the SQL Server Express install directory 50 Starting FortiClient EMS and logging in 51
4.1。Unpacking and handling the battery ....................................................................................... 9 4.2.Download and install the VictronConnect app ........................................................................... 9 4.2.1.Update the battery and BMS firmware .......................................................................... 9 4.3.使用前的初始充电....................................................................................................................................................................................................................................................................................................................................................................................................................................................... 10 4.3.1。Why charge batteries before use .............................................................................. 10 4.3.2.How to charge batteries before use ........................................................................... 10 4.4.Mounting .................................................................................................................... 12 4.5.Connecting battery cables ................................................................................................ 12 4.5.1.Cable cross-sectional area and fuse ratings ................................................................. 12 4.5.2.Connecting a single battery .................................................................................... 12 4.5.3.Connecting multiple batteries in series ....................................................................... 13 4.5.4.Connecting multiple batteries in parallel ...................................................................... 13 4.5.5.Connecting multiple batteries in series/parallel .............................................................. 13 4.5.6.Battery banks consisting of different batteries ............................................................... 14 4.6.Connecting the BMS ...................................................................................................... 14 4.7.Charger settings ........................................................................................................... 15 4.8.调试...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
单位代码单位名称UEERE0060设计网格连接的电池存储系统先决条件:UEERE0054电网连接光伏和电池存储系统UEERE 0061设计网格连接的光伏电源供应系统的行为调查0061设计,并验证EEEEL 0039设计,安装并验证Electical 0039的功能,或UNICERICATION ONERELICAL OELLICAL INSLACKITY 51 UEERE0077安装电池存储设备电源转换设备到网格先决条件:UEEEL0012安装低压接线,设备,开关设备和相关配件UEERE0054电网连接光伏和电池存储系统的行为现场调查UEERE 0078安装电池设备,安装电池设备,将电池安装到电力相关的设备上:和UEERE0054网格连接的光伏和电池存储系统或UEERE 0055的电池电池0055行为现场调查的行为现场调查
Introduction 10 FortiClient EMS components 10 Documentation 12 Getting started 13 Getting started with managing Windows, macOS, and Linux endpoints 13 Initially deploying FortiClient software to endpoints 13 Pushing configuration information to FortiClient 14 Relationship between FortiClient EMS, FortiGate, and FortiClient 14 Getting started with managing Chromebooks 19 Configuring FortiClient EMS for Chromebooks 19 Configuring the Google Admin console 19 Deploying a profile to Chromebooks 19 How FortiClient EMS and FortiClient work with Chromebooks 20 Installation preparation 21 System requirements 21 License types 22 FortiClient EMS 22 Component applications 25 Required services and ports 25 Telemetry data usage requirements 28 Management capacity 29 Hardware configuration when EMS and SQL Server run on same machine with no FortiGate connected 31 Hardware configuration when EMS and SQL Server run on different machines with no FortiGate connected 31 Hardware configuration when there are FortiGates connected to the EMS 33 FortiClient Telemetry security features 34 Server readiness checklist for installation 34 Upgrading EMS 34 Upgrading from an earlier FortiClient EMS version 34 Auto upgrading EMS to latest patch release 36 Install preparation for managing Chromebooks 38 Google Workspace account 38 SSL certificates 38 Installation and licensing 39 Downloading the installation file 39 Installing FortiClient EMS 39 Installing FortiClient EMS to specify SQL Server Enterprise or Standard instance 41 Installing FortiClient EMS using the CLI 45 Allowing remote access to FortiClient EMS and using custom port numbers 47 Customizing the SQL Server Express install directory 48 Starting FortiClient EMS and logging in 48 Configuring EMS after installation 50
Glacier ® II 犁无需工具即可在四十秒或更短时间内安装完毕(初始安装支架后)——比市面上任何其他犁都快得多。我们的 Easy Lift 犁
第3章。硬件更换过程。。。。。。。。。。。。。。。27安装指南。。。。。。。。。。。。27系统可靠性指南。。。。。。。。28处理静态敏感设备。。。。。。29返回设备或组件。。。。。。29更新计算节点配置。。29计算节点更换。。。。。。。。。。30从机箱中删除计算节点。。。30在底盘中安装计算节点。。。。。31 2.5英寸热驱动器更换。。。。。。33卸下2.5英寸的热盘驱动器。。。。。33安装2.5英寸的热盘驱动器。。。。。。34 2.5英寸驱动背板更换。。。。。。35卸下2.5英寸驱动背板。。。。35安装2.5英寸驱动背板。。。。。36个转移式组装替换。。。。。37卸下转移 - 保留组件。。。38安装适配器 - 保留组件。。。。40空气挡板更换。。。。。。。。。。。。41拆下空气挡板。。。。。。。。。。。42
Introduction 9 FortiClient EMS components 9 Documentation 11 Getting started 12 Getting started with managing Windows, macOS, and Linux endpoints 12 Deploying FortiClient software to endpoints 12 Pushing configuration information to FortiClient 13 Relationship between FortiClient EMS, FortiGate, and FortiClient 14 Getting started with managing Chromebooks 18 Configuring FortiClient EMS for Chromebooks 18 Configuring the Google Admin console 18 Deploying a profile to Chromebooks 18 How FortiClient EMS and FortiClient work with Chromebooks 19 Installation preparation 20 System requirements 20 License types 21 FortiClient EMS 21 Component applications 24 Required services and ports 24 Management capacity 27 Hardware configuration when EMS and SQL Server run on same machine with no FortiGate connected 29 Hardware configuration when EMS and SQL Server run on different machines with no FortiGate connected 29 Hardware configuration when FortiGates are connected to EMS 30 FortiClient Telemetry security features 32 Server readiness checklist for installation 32 Upgrading from an earlier FortiClient EMS version 32 Upgrading EMS and FortiClient 33 Upgrading EMS from an earlier version 33 Install preparation for managing Chromebooks 34 Google Workspace account 34 SSL certificates 34 Installation and licensing 35 Downloading the installation file 35 Installing FortiClient EMS 35 Installing FortiClient EMS to specify SQL Server Enterprise or Standard instance 37 Installing FortiClient EMS using the CLI 40 Allowing remote access to FortiClient EMS and using custom port numbers 42 Customizing the SQL Server Express install directory 43 Starting FortiClient EMS and logging in 43 Configuring EMS after installation 44 Licensing FortiClient EMS 45
•在2026/2027获得建筑和设施计划的资金。•在2024年9月之前支出31AA的所有资金。•到2024年8月,建立了一个新的餐饮服务伙伴。•重新投标监护服务,并在2025年8月之前达成新的Enviroclean协议或新合作伙伴。•简化新员工的登机工作,并考虑在线入职平台。•跨建筑物安装一致的系统。•在2027年6月30日之前安装系统通信技术。•安装通用密钥系统。
3 木质底层地板:首先移除所有现有地板覆盖物。不应有霉菌和/或昆虫侵染的迹象。确保底层地板平整。用钉子固定所有松动部分。如果木质底层地板平整(1 米长度内不大于 2 毫米的不平整度):您可以安装任何 QS 底层地板。如果木质底层地板不平整,且凹凸度 > 2mm 且 < 4mm(由于木质底层地板板弯曲,因此可以安装 QS Thermolevel 衬垫。如果木质底层地板不平整,且凹凸度 > 4mm,则必须安装纤维找平化合物或衬垫 + 胶合板 / OSB 找平地板。将新地板与现有底层地板成九十度安装。木板地板下的爬行空间必须通风良好。移除所有障碍物,确保通风良好(每平方米 (40”) 地板至少有 4 厘米 (1/2”) 的总通风口)。木材的含水量不得超过 10%。
NINETY DAY ESTABLISHMENT PERIOD Irrigation / Water Management • Provide adequate watering daily to all newly planted material twice daily • Install slow-release watering bags to all site trees and maintain water level Shrub Areas • Weed and remove all debris from shrub areas • Maintain shrub appearance (removal of dead or broken branches) • Ensure proper position and elevation of all plant material is maintained Spring Clean-up / Spring Service • Prune / Repair winter damage to trees (up to 12' in height)和灌木•清洁和培养所有灌木区的树木和灌木服务•修剪以包括所有灌木和装饰树•所有灌木和装饰树应拆除死木和穿越树枝。•彼此倾斜植物以形成植物的分离和变薄