• MW reduction to 1,726MW from 1,904MW due to Non- renewal of Kipevu 1 and the of Muhoroni PPA • Commissioned 172MW Olkaria V geothermal power plant • Joined UNGC and the UNGC BoD • Commissioned 86MW Olkaria I Additional Unit 6 geothermal power plant • Completed full Redemption of KenGen Infrastructure Bond • Takeover of the operation and maintenance of 140MW Kipevu III from Wartsila to KenGen • Commenced geothermal commercial drilling in Ethiopia and Djibouti • Operation and Maintenance contract with REREC for the 50MW Garissa Solar Power Plant • Completed construction of Naivasha Level 5 Outpatient Hospital CSR project • Rehabilitation of Wanjii Power Station
1 USB drive with a digital copy(.pdf) of all documents included in application (if submitting application in person) 2 Project Letter 3 Application (completed and signed by owner and agent) 4 Survey and/or Metes and Bounds Description of the property, with an exhibit illustrating property boundaries 5 Deed showing current ownership of entire subject property 6 Letter of Authorization for appointed agent (if applicable) 7 Completed TIA Worksheet 8 Traffic Impact Analysis (Digital copy only if required) 14 9一般性声明确定拟议区将如何与该市的综合计划有关。10一般的通道布局,指示拟议的街道,至少到动脉街道。11拟议的开发标准12个相位时间表(如果适用)5
Individuals seeking an exemption for medical reasons must submit a completed COVID-19 Vaccination Medical Exemption Request Form to Employee Health (VaxMedEx@mhs.net) and must provide a Medical Certification Form completed, signed and dated by their licensed healthcare provider, which must (1) contain all information specifying which of the authorized COVID-19 vaccines are clinically contraindicated; (2)概述了员工对疫苗的特定公认的临床禁忌症或CDC征求的延迟接种疫苗的原因; (3)包含认证提供者的声明,建议根据公认的临床禁忌症豁免个人的疫苗要求,或者根据CDC建议延迟了疫苗接种。认证医疗保健提供者可能不是要求豁免的个人,并且必须在其各自的实践范围内行事。
凭借其在材料科学领域的独特专业知识,阿科玛提供一流的技术组合,以满足对新型可持续材料不断增长的需求。阿科玛集团立志在 2024 年成为特种材料领域的专业企业,集团分为三个互补、富有弹性且高度创新的部门,专门从事特种材料业务 - 胶粘剂解决方案、先进材料和涂料解决方案,占 2020 年集团销售额的 82% 左右,以及一个定位良好、竞争激烈的中间体部门。阿科玛提供尖端技术解决方案,以应对新能源、水资源获取、回收、城市化和流动性等方面的挑战,并与所有利益相关者建立长期对话。阿科玛集团报告称,2020 年销售额约为 80 亿欧元,业务遍及全球约 55 个国家,拥有 20,600 名员工。
M.S. 机器人技术需要在所有三个专业的三个基础领域的能力。 学生必须在三个基础区域中的每个课程中参加两门课程之一。 In addition to fulfilling the general scholarship requirements of the Division, all course work must be completed in accordance with the regulations of the Graduate School (http://bulletins.wayne.edu/graduate/general-information/academic- regulations/) and the College of Engineering (http://bulletins.wayne.edu/ graduate/college-engineering/academic-regulations/).M.S.机器人技术需要在所有三个专业的三个基础领域的能力。学生必须在三个基础区域中的每个课程中参加两门课程之一。In addition to fulfilling the general scholarship requirements of the Division, all course work must be completed in accordance with the regulations of the Graduate School (http://bulletins.wayne.edu/graduate/general-information/academic- regulations/) and the College of Engineering (http://bulletins.wayne.edu/ graduate/college-engineering/academic-regulations/).
NURSING STUDENT INFORMATION LAST NAME ________________________ FIRST NAME _____________________ KSU ID# ________________________ NURSING STUDENT'S SIGNATURE DATE SIGNED _____________________________________ _______________ --------------------------------------------------------------------------------------------------- *This section to be completed by Administering Professional* FACILITY NAME: ADDRESS/STAMP: DATE OF ADMINISTRATION: DELTOID OF管理:疫苗制造商和到期日期:
Patient has completed Phase I-III of treatment and BG<250mg/dL: Phase I: Fluid Rehydration with NS Phase II: Fluid Replacement without dextrose, replace K + , begin insulin Phase III: Fluid Replacement adding dextrose, continue insulin and K +
我们目前对时间表的总体低 - 中等信心。More detailed timelines cannot be provided until the following are all completed: • We are engaging with industry in parallel on the changes, code modifications, etc and these need to be finalised as soon as possible to finalise the design • We are engaging with our IT Vendors on the detailed design and delivery schedules and are awaiting final timelines Tranche 1 - We are Here
10% Completed - Construction 0% Completed - Testing and Commissioning Updated Capacity Based on the Latest Technical Documents Pasuquin-Burgos 100MW Solar Power Plant Solar Energy logics Philippines Inc. Municipality of Pasuquin and Burgos, Ilocos Norte I 49.000 Apr 2026 Jun 2026 Under Gea-2 Opus Solar Project Solar Energy Corp. Paoay, Ilocos Norte I 149.950 oct 2026 dec 2026 under gea-2 IXUS BUALON SOLU SOLAR SOLAR SOLIL SOLAR COLP COLP GUALlon, Pangasinan I Solutions inc San Pablo, Isabela IILA 79.040 oct 2026 dec 2026 under gea-2 Santa Rosa Nueva Ecija 3 Solar Power Project Solar Philippines Commercial Rooftop Projects, Inc. Santa Rosa and Cabanatuan nueva ecija III 20.000 2026年10月2026年12月2026年GEA-2 Linglingay Solar Power项目太阳能Xyris Energy Corporation Brgy。 Lingling,Gamu,Isabela II 70.140 2026年10月2026年12月2026年GEA-2 NKS下一个浮动太阳能太阳能Solar Nks Solar One Inc. Lumban City and Cavinti City,Laguna IIV-A 90.000 90.000 1026年10月2026年12月2026年GEA-2 WIND 1220.384 38410% Completed - Construction 0% Completed - Testing and Commissioning Updated Capacity Based on the Latest Technical Documents Pasuquin-Burgos 100MW Solar Power Plant Solar Energy logics Philippines Inc. Municipality of Pasuquin and Burgos, Ilocos Norte I 49.000 Apr 2026 Jun 2026 Under Gea-2 Opus Solar Project Solar Energy Corp. Paoay, Ilocos Norte I 149.950 oct 2026 dec 2026 under gea-2 IXUS BUALON SOLU SOLAR SOLAR SOLIL SOLAR COLP COLP GUALlon, Pangasinan I Solutions inc San Pablo, Isabela IILA 79.040 oct 2026 dec 2026 under gea-2 Santa Rosa Nueva Ecija 3 Solar Power Project Solar Philippines Commercial Rooftop Projects, Inc. Santa Rosa and Cabanatuan nueva ecija III 20.000 2026年10月2026年12月2026年GEA-2 Linglingay Solar Power项目太阳能Xyris Energy Corporation Brgy。Lingling,Gamu,Isabela II 70.140 2026年10月2026年12月2026年GEA-2 NKS下一个浮动太阳能太阳能Solar Nks Solar One Inc. Lumban City and Cavinti City,Laguna IIV-A 90.000 90.000 1026年10月2026年12月2026年GEA-2 WIND 1220.384
(1)年度支付的每股股息,与上一年的结果有关。Adjusted for the 2-for-1 share split in 2007, for free shares attributions and for the capital increase completed in October 2016 (2) Subject to approval at the Shareholders' Meeting scheduled for May 6, 2025 (3) Adjusted for the free share attribution in 2024 (4) Compound annual growth rate of an investment in Air Liquide shares, including reinvested dividends and loyalty bonus, 2005-2024
