i)每年开始薪水为79,875.83英镑至103,903.67英镑(Cognus Band 6到董事乐队) probation) Sovereign Healthcare Cashback plans vii) Staff Equality, Diversity and Inclusion group and Mental Health First Aiders to support wellbeing and inclusion viii) Cognus Coaching Programme ix) An ambitious culture with friendly and supportive colleagues If you are interested and would like to be considered for this role, please apply to recruitment@cognus.org.uk with the completed application form downloaded from https://www.cognus.org.uk/work-with-us/current-vacancies/cognus-application-form/,这也必须伴随着概述您适合性的封面(不超过两个侧面,最小字体11)。收据的截止日期是2025年1月24日星期五午夜。候选人可在2025年1月28日至30日进行面试。如果您想在申请之前有关此角色的更多信息,请通过joanna cassey(董事总经理)通过joanna.cassey@cognus.org.uk来安排有关该角色的非正式聊天。所有就业机会都需要成功完成招聘手续,其中包括增强的DBS检查。这些检查必须在就业开始之前完成。我们希望我们的员工应充分考虑保护和促进儿童和年轻人的福利,并遵循公司和萨顿当地保护合作伙伴关系所采用的儿童保护程序。
13。Given the Parties' different strengths and inter-relationships across various EDA and S&A markets (with Synopsys primarily active in EDA software and Ansys primarily active in S&A software), the CMA also considered whether the Merger would lead to rivals in various EDA and S&A software markets being harmed as a result of the Merged Entity limiting rivals' access to a key input, reducing or removing interoperability between its产品和竞争对手的产品和/或捆绑各方的工具。最终,CMA认为合并的实体将没有动机参与这种行为,因为这种策略的损失将超过收益。在得出这一结论时,CMA认为,除其他证据外,各方的顶级客户(所有人都是具有广泛行业知识的全球公司)认为合并不太可能产生这种影响。这是因为,例如,客户在芯片设计流的每个阶段使用他们认为是最好的质量软件(即他们来自不同供应商的软件混合和匹配软件),因此,如果互互操作性被删除或删除,互操作性对这些产品的价值很重要,并且很大一部分客户将从合并的实体转换。对CMA合并调查做出回应的绝大多数客户对合并有积极或中性的看法。
摘要:这项研究评估了一个地区合并热量需求的影响,目的是通过能源,自我,经济,经济经济和环境指标来提高热量生产单位,以及对投资和燃料成本的敏感性。The following production systems to satisfy the heat demands (domestic hot water production and space heating) of a mixed district composed of office (80%), residential (15%), and commercial (5%) buildings are considered: gas- and biomass-fired boilers, electric boilers and heat pumps (grid-powered or photovoltaic -powered), and solar thermal collectors.进行比较,检查了三种系统尺寸方法:在建筑规模,行业规模(住宅,办公室和商业)或地区规模上。对于所研究的配方,高降低的效果高达5%(能量和驱逐),所有系统的升级成本较低(20%至54%),高达55%的exergy销毁成本高达55%,并且高达5%的CO 2降低。总而言之,提高和需求汇总倾向于改善特定的效率,降低特定成本,通过峰值功率大小方法减少总投资,并减轻太阳能驱动系统中的时间不匹配。可能的缺点是由于分布网络而导致的额外热量损失,并且由于所需的温度较高而导致热泵的性能降低。尽管如此,在大多数情况下,优势胜过缺点。
最近的一些表现可能较低或更高。作为资本价值和收益随时间变化(尤其是由于货币波动),股票的回购价格可能更高或低于其初始价格。所指示的绩效基于股票类别的NAV(净资产价值),并且是适用于基金的所有费用的净值,但不考虑出售佣金,税收或付款代理费用,并假定股息是重新投资的。考虑此类费用或佣金将降低回报。根据费用和入场费之间的差异,其他股份类的绩效将更高或更低。In the periods where certain share classes are not subscribed or not yet created (inactive share classes), performance is calculated based on the actual performance of an active share class of the fund whose characteristics are considered by the management company as being closest to the inactive share class concerned, after adjusting it for the differences between the total expense ratios (TER), and converting any net asset value of the active share class in the currency in which the inactive share class is listed.不活动共享类给出的性能是提供信息的计算结果。请阅读本文档末尾注释中给出的重要信息。(1)在做出任何最终投资决定之前,请参考基金的招股说明书和孩子。
The rational use of biologically active substances or plant growth stimulants from natural materials like seaweed is one of the most promising trends in agriculture, as seaweed is considered a safe and sustainable bio stimulant for improving plant growth, particularly under abiotic stress due to its high content of Cytokinin's, auxins, gibberellins, amino acids, phytohormones, Osmo protectants, mineral nutrients, and抗菌化合物。当前的工作探讨了海藻提取物对不同作物的影响,它们在植物中起的功能作用以及海藻提取物在综合作物管理系统中的潜在价值对可持续作物生产。各种元素会影响农业中使用的海藻提取物的有效性,例如海藻,制造方法和浓度,而应用技术被认为是海藻提取物在改善植物生长中有效性的决定因素。海藻提取物以两种基本方式合成:通过物理技术和化学方法。使用碱提取是最商业的方法,在维持生物活性成分方面非常有效。许多报告已经证实了海藻提取物在改善植物生长方面的疗效及其在改善种子发芽,改善根系的生长,提高幼苗生存率,提高幼苗生长和在非生物胁迫下提高植物的生长和生产力,并增强植物对病原体的耐药性。
显示的性能数据代表过去的表现,并不是未来结果的保证。最近的一些表现可能较低或更高。作为资本价值和收益随时间变化(尤其是由于货币波动),股票的回购价格可能更高或低于其初始价格。所指示的绩效基于股票类别的NAV(净资产价值),并且是适用于基金的所有费用的净值,但不考虑出售佣金,税收或付款代理费用,并假定股息是重新投资的。考虑此类费用或佣金将降低回报。根据费用和入场费之间的差异,其他股份类的绩效将更高或更低。In the periods where certain share classes are not subscribed or not yet created (inactive share classes), performance is calculated based on the actual performance of an active share class of the fund whose characteristics are considered by the management company as being closest to the inactive share class concerned, after adjusting it for the differences between the total expense ratios (TER), and converting any net asset value of the active share class in the currency in which the inactive share class is listed.不活动共享类给出的性能是提供信息的计算结果。请阅读本文档末尾注释中给出的重要信息。(1)在做出任何最终投资决定之前,请参考基金的招股说明书和孩子。
A.监视和记录学生的进度B.提供并维持有序的课堂环境C.与协调员,同伴,老师和支持人员进行独立和合作的工作D.可在夏季机器人的开始前一周参加一周的员工会议E.可以在整个两周内工作的能力。性取向或跨性别的认同,残疾,年龄,宗教,身高,体重,婚姻或家庭地位,军事地位,祖先,遗传信息或任何其他法律保护类别,包括就业机会,包括就业机会。犯罪记录按照州法律和董事会政策进行检查,在被指纹并通过犯罪记录审查之前,任何人都不得雇用任何人与儿童联系。本职位描述中包含的信息是为了遵守《美国残疾人法》(A.D.A.)并不是该职位履行的职责的详尽清单。目前担任此职位的个人履行了其他职责,可以分配其他职责。Application Deadline: March 21, 2025 Employment Dates: Meeting: July 1, 2025, Summer School dates: July 7, 2025 - July 31, 2025 Salary: $2,500.00 for the four weeks Apply To: To be considered as a candidate, you must submit by the deadline a letter of interest stating rationale for applying and qualifications for the position to: Sherri Simmons, Human Resources ssimmons@gulllakecs.org ph:269/548-3415
现代的诊断精神障碍的技术是在19世纪后期建立的(La o o ey,2003年),但其起源可以追溯到公元前4世纪(Elkes and Thorpe,1967)。Gold standard for diagnosing most mental-disorders rely primarily on information collected from various informants (e.g., parents, teachers) regarding the onset, course, and duration of various behavioral descriptors that are then considered by providers when conferring a diagnostic decision based on DSM-5/International Classification of Diseases-10th Edition (ICD-10) criteria ( World Health Organization, 2004; Pelham et al., 2005年;美国精神病学协会,2013年)。提供者用于获得此信息的方法从相对主观(例如评级量表)和非结构化(例如,非结构化的临床访谈)到更客观的(例如直接观察)和结构化(例如结构化诊断访谈)方法。自闭症谱系障碍(ASD)和注意力/多动症(ADHD)是通常持续到成年的儿童中普遍存在的脑部疾病。ASD是一种神经发育障碍,其特征是患者的沟通,行为和社交互动术语,其中可能包括重复行为,易怒和注意力问题(Maenner等,2020)。自从引入精神疾病的诊断和统计手册(DSM-5)以来,ASD反映了一个较大的伞诊断实体,该实体以前反映了多种离散疾病,包括自闭症疾病,Asperger's综合征以及其他普遍性发展的多种疾病,
Change Log 6 Introduction and supported models 9 Supported models 9 Special notices 10 IPsec phase 1 interface type cannot be changed after it is configured 10 IP pools and VIPs are not considered local addresses for certain FortiOS versions 10 Support for FortiGates with NP7 processors and hyperscale firewall features 10 Changes in CLI 11 Changes in GUI behavior 13 Changes in default behavior 14 Changes in default values 15 Changes in table size 16 New features or enhancements 17 Upgrade information 30 Fortinet Security Fabric upgrade 30 Downgrading to previous firmware versions 31 Firmware image checksums 32 Strong cryptographic cipher requirements for FortiAP 32 FortiGate VM VDOM licenses 32 VDOM link and policy configuration is lost after upgrading if VDOM and VDOM link have the same name 32 GUI firmware upgrade does not respect upgrade path 33 Product integration and support 34 Virtualization environments 35 Language support 35 SSL VPN支持36 SSL VPN Web模式36解决问题37反垃圾邮件37抗病毒37应用程序控制37数据泄漏预防38端点控制38显式代理38 FIREWALL 38 FORTIVIEW 40 GUI 40 HA 42 HYPERSCALE 42 HYPERSCALE 43 ICAP 44 ICAP 44
表3-1。 NYCA重合峰负荷(MW)........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Partial List of Local Upgrades (LTP) Considered in LIPA ............................................... D- 14 Table 3-3. 总太阳能和陆上风(MW)................................................................................................................................................................................................................................................................................................................................................................................................................................................... Substation Screening Results ............................................................................................. D- 22 Table 3-5. Step 1 Shortlisted Substations, Not Included in Final Screening List ........................... D- 22 Table 3-6. OSW Injections - Scenario 1 ............................................................................................... D- 24 Table 3-7. Sensitivity Conditions - Scenario 1 ..................................................................................... D- 25 Table 3-8. Scenario 1: N-1 Contingency Analysis Results ................................................................ D- 26 Table 3-9. Scenario 1: N-1-1 Contingency Analysis Results ............................................................. D- 26 Table 3-10. Revised Sizing/Placement of Storage Facilities ............................................................. D- 27 Table 3-11. 方案1:N-1应急分析结果(调整后的存储设施).......................................................................................................................................................................................................................................................................................................................................................表3-12表3-12。 方案1:N-1-1应急分析结果(调整后的存储设施)........ d- 28表3-13。 Scenario 1: N-1 Contingency Analysis Results, 2030 Study Year* ............................ D- 28 Table 3-14.表3-1。NYCA重合峰负荷(MW)...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................Partial List of Local Upgrades (LTP) Considered in LIPA ............................................... D- 14 Table 3-3.总太阳能和陆上风(MW)...................................................................................................................................................................................................................................................................................................................................................................................................................................................Substation Screening Results ............................................................................................. D- 22 Table 3-5.Step 1 Shortlisted Substations, Not Included in Final Screening List ........................... D- 22 Table 3-6.OSW Injections - Scenario 1 ............................................................................................... D- 24 Table 3-7.Sensitivity Conditions - Scenario 1 ..................................................................................... D- 25 Table 3-8.Scenario 1: N-1 Contingency Analysis Results ................................................................ D- 26 Table 3-9.Scenario 1: N-1-1 Contingency Analysis Results ............................................................. D- 26 Table 3-10.Revised Sizing/Placement of Storage Facilities ............................................................. D- 27 Table 3-11.方案1:N-1应急分析结果(调整后的存储设施).......................................................................................................................................................................................................................................................................................................................................................表3-12表3-12。方案1:N-1-1应急分析结果(调整后的存储设施)........ d- 28表3-13。Scenario 1: N-1 Contingency Analysis Results, 2030 Study Year* ............................ D- 28 Table 3-14.Scenario 1: N-1-1 Contingency Analysis Results, 2030 Study Year .......................... D- 29 Table 3-15.Scenario 1: N-1 Contingency Analysis Results, 2025 Study Year .............................. D- 29 Table 3-16.Scenario 1: N-1-1 Contingency Analysis Results, 2025 Study Year .......................... D- 29 Table 3-17.SCR at OSW Connection Points — All-Lines-In Conditions ........................................ D- 30 Table 3-18.SCR at OSW Connection Points — Line-Out Conditions ............................................. D- 31 Table 3-19.Curtailment Identified in Economic Analysis ................................................................... D- 32 Table 3-20.OSW注射 - 方案2 ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................Scenario 2: N-1 Contingency Analysis Results, 2035 Study Year .............................. D- 38 Table 3-22.Scenario 2: N-1-1 Contingency Analysis Results, 2035 Study Year .......................... D- 38 Table 3-23.Scenario 2: N-1 Contingency Analysis Results, 2030 Study Year* ............................ D- 38 Table 3-24.Scenario 2: N-1-1 Contingency Analysis Results, 2030 Study Year .......................... D- 38 Table 3-25.Curtailment Identified in Economic Analysis ................................................................... D- 39 Table 3-26.OSW Zone K Injections - Scenario 3 ............................................................................... D- 41 Table 3-27.分析了离岸路线走廊,海岸进场和着陆点以及点经济分析中确定的缩减...........................................................................................................................................................................................................................................................................................................................................................................................................................Connection Concept Descriptions ...................................................................................... D- 58 Table 5-2.Summary of Preliminary Review ......................................................................................... D- 61 Table 6-1.
