Shri Prabhas Bajaj,律师,SECI Shri Shubham Arya,律师,SECI 女士Tanya Sareen,律师,SECI Shri S. Das,SECI Shri Gopal Jain,Sr.律师、Welspun 和 Avaada Energy Shri Amit Ojha,律师、Welspun 和 Avaada Energy 女士。 Meha Chanrda 女士,Welspun 和 Avaada Energy 律师。 Shreya Mukerjee,律师,Welspun 和 Avaada Energy Shri Ashish Bhardwaj,律师,Welspun 和 Avaada Energy Shri Amit Ojha,律师,Welspun 和 Avaada Energy
来自SECI/SPD的额外能量超过2.7408亿千瓦时(MUS)。如果在任何合同年度中,发现SPD都无法产生211179万千瓦时(MUS)的最低能量,直到10年结束至SCD和1933万kWh(MU),该协议的其余期限为SECI签署了SECI的余额,因为该协议的其余部分付出了不可超过的spd,该协议的其余期限均可以为SPD付费,而这些spd spd spd spd spd spd spd spd spd spd spd spd spd spd spd spd spd spd spd spd spd spd,应将此类赔偿额适当地向SECI支付,以使SECI能够将金额汇出给购买公用事业。下限将通过seci放松,因为疏散网格无可用性的程度,这超出了SPD的控制。(由SLDC/RLDC认证)。此类薪酬的金额应由适当的委员会/机构确定,此类 div>
…出席的被告方:PSEPL 律师 Shri Sanjay Sen,PSEPL 律师;PSEPL 律师 Shri Nitish Gupta,PSEPL 女士。 Nipun Sharma, PSEPL 律师,女士Mandakini Ghosh 女士,PSEPL 律师 Shri Ruth Elvin,PSEPL 律师Neha,律师,PSEPL Shri MG Ramachandran,Sr.律师,SECI 女士Anushree Bardhan,SECI 律师,女士Tanya Sareen,律师,SECI Aneesh Bajaj 先生,律师,SECI Akshay Goel 先生,律师,MSEDCL Anup Jain 先生,律师,MSEDCL
在特定日期早上 6:00 之前收到买方实体的高峰时段时间表后,SPD 应在当天的高峰时段自行决定供应高峰电力。高峰电力供应若低于买方实体根据本条款的要求,则应根据电力购买协议处理。4.11 修改如下:在 SCSD 之前,SPD 应被允许开始以项目的全部或部分容量供电,但须具备传输连接和通用网络接入 (GNA)。提前开始项目供电的风险和费用由 SPD 完全承担。在提前部分或全部开始供电的情况下,SPD 应提前十五 (15) 天通知买方实体和 SECI,告知其提前调试全部或部分容量。买方实体和 SECI 应在收到此类通知之日起 15 天内同意使用此类电力。如果买方实体和 SECI 均未在上述规定期限内同意购买电力,则 SPD 可以在电力交易所或通过双边安排出售买方实体和 SECI 未同意的部分电力,直至 SCSD 或 SECI 通知的项目电力采购开始之日(以较早者为准)。但如果买方实体和 SECI 均同意购买电力,则买方实体将优先获得此类电力。如果 SECI/买方实体同意在 SCSD 之前从此类早期部分/全部合同容量购买电力,则 SECI 将以 PPA 电价购买此类电力,并以 PSA 电价出售给买方实体,电力采购的其他条款和条件可参考 PPA 和 PSA 以背对背方式进行。 5. 33.ii.b. 电力交易部能源管理部
1。先生。 div>Buddy A. Ranganadhan,Sr。倡导者,brpl 2。先生。 Dushyant Manocha,倡导者,BRPL 3。 div>先生。 M. G. Ramachandran,高级倡导者,seci 4。ms。 Anushree Bardhan,倡导者,Seci 5。ms。 Shirsa Saraswat,倡导者,Seci 6。ms。 Surbhi Kapoor,倡导者,Seci 7。先生。 Sajan Poovayya,高级倡导者Acme Solar 8。先生。 Aniket Prasoon,倡导者,Acme Solar 9。ms。 Pratiksha Chaturvedi,倡导者,Accme Solar 10。先生。 Shubham Singh,Acme Solar 11。的倡导者先生。 Acme Solar 12的倡导者Sarthak Sareen 12。ms。 Sanjeevani Mishra,Acme Solar的拥护者
…出席的被告方: Shri Amit Kapur,律师,RWEPL Shri Rahul Kinra,律师,RWEPL Shri Aditya Ajay,律师,RWEPL Shri Aashwyn Singh,律师,RWEPL Shri MG Ramachandran,Sr.律师,SECI 女士Tanya Sareen 女士,SECI 律师。 Anushree Bardhan,SECI 律师,女士Surbhi Kapoor 女士,SECI 律师Suparna Srivastava 女士,PGCIL 律师。 Aastha Jain,律师,PGCIL Shri Tushar Mathur,律师,PGCIL Shri G. Umapathy,Sr.律师,MPPMCL Shri Aditya Singh,律师,MPPMCL Shri Swapnil Verma,PGCIL Shri Ranjit Singh,PGCIL Shri Lashit Sharma,PGCIL Shri Smarajit Sahoo,RWEPL
根据印度政府的指南,与国家间传输系统(ISTS)(ISTS)相关的风力发电项目(Tranche - XII),并通过竞争性竞标过程进行选择。请愿人:印度太阳能公司有限公司(SECI)受访者:NTPC可再生能源有限公司和7 ORS。听证会日期:12.2.2024 Coram:Shri Jishnu Barua,主席Shri Arun Goyal,Shri P. K. K. Singh会员Shri Arun Goyal,出席会议的成员派对:Seci Shri Rahul Rahul Ranjan倡导者,Seci Shri Mudit Shri Mudit Jain Shri Shri Shri Shri Shri Shri Shri Aman sheri and Jains shri and sheri Shri Shri shri shri shri and jew ans j. shri and j. JSWRETL SHRI AMAN DIXIT,倡导者,JSWRETL Natasha女士,倡导者,JSWRETL女士Ruth Elwin女士,倡导者,JSWRETL SHRI RAKESH RATHORE,JSWRETL,JSWRETL
印度太阳能公司有限公司(SECI),地址:Sh. Atul Kumar Naik,ED(EM),NBCC 办公室,B 座大厦 2 号,东 Kidwai Nagar,新德里 - 110023。……根据 2003 年《电力法》第 86(1)(b) 和 (e) 条以及 2024 年《HPERC(业务行为)条例》第 56 和 57 条,被告请愿批准根据 SECI 进行的竞争性招标,根据 ISTS 连接混合动力项目第七部分,从印度太阳能公司有限公司(SECI)采购 900MW 风能-太阳能混合电力。
➢ 发布新的 RFS :2024 年 9 月发布了 11,098 MW 的 RE 招标。 ➢ 2024 年 9 月,SECI、SJVN、NTPC、NHPC、RUMSL 和 GUVNL 等各种实体共发布了 6850 MW 的存储容量。这约占已发布总招标容量的 61%,其次是太阳能(23%)、风能太阳能混合(10.8%)和风能(4.5%)。 ➢ NTPC 发布了 1200 MW ISTS 联网风能-太阳能混合招标,并附带高达 600 MW 额外容量的绿鞋选择权。 ➢ SECI 邀请投标参加 1000 MW ISTS 联网太阳能招标(ISTS-XVIII)。此外,SECI 还启动了其首个 500 MW ISTS 联网海上风电招标。
向请愿人学习的律师认为,请愿人正在寻求适当的方向澄清,以至于授予的奖励(LOA)(LOA)2.2.2024和附录由被告发行的附录(Solar Energy Corporation of India Ltd. Ltd.(SECI)(SECI)的第2号被告人(SECI)签发为成功的竞争者,并在竞争中签发了该竞争者的竞争者,该签发的竞争者是由竞争者签发的,该签发的竞争者是由竞争者派发的。授予第1号受访者的请愿人是授予连通性的CTUIL,是出于从太阳能工厂到其绿色氢工厂的电力供应,并根据法规第5.8(xi)(a)条的要求作为LOA作为LOA资格,并且作为与LOA相同的足以在政府规定下建立Solar工厂。学习的请愿人的律师主要提交: