Development The development consists of the construction of an extension to an existing wastewater treatment plant (WWTP) where the works include:- A) Demolition of an existing storage building (17.50m2) and construction of a new single- storey industrial type building to enclose the DAF unit granted planning permission under planning reference LB180300 and to provide new enclosed storage and control rooms (total floor area 119m2).b)在进气口时安装新的污泥按压,将曝气罐更改为缺氧罐,安装2号。其他曝气箱,对周边护堤的改建,以将WWTP的足迹增加539m2,并在规划许可LB180300的规划许可下获得了计划许可。C) Treated wastewater rising main from the site of the proposed development to new discharge point at the River Boyne (distance 7.2km), where pipeline shall be laid along a section of Windmill Road, the L1013, Yellow Furze Road, the L1600 (Boyne Road), and the unnamed local road leading from the L1600 to the private lands abutting the River Boyne at the discharge point.此计划申请伴随着环境影响评估报告(EIAR)和Natura Impact声明(NIS)。