施工阶段预计将于2025年初开始,持续约12到18个月。Main construction activities will include: • Site establishment – fencing, ground preparation, construction of internal roads and paths, preliminary civil works and any necessary drainage • Installation of steel post and framings • Installation of underground cabling (trenching) and installation of inverter stations • Installation of power generators • Construction of control, switch room and storage building • Construction of the substation and connections • Removal of temporary construction facilities and rehabilitation of disturbed区域•美化环境•安装筛查植被(如果需要)