加热/冷却负载计算由以下操作:____________________电话:__________总加热负荷(基于ACCA MAN。J或其他批准的方法):____________ BTU/H总冷却负载(基于ACCA MAN。J or other approved methodology) :____________ Btu/h Cooling Sensible Load:_____________ Btu/h Cooling Latent Load :__________ Btu/h Total Air Handler CFM (based on design calculations) :_________________ CFM Duct Tightness Test Conducted by: ______________________ Phone:___________ CFM 25 per 100 ft 2 of conditioned floor area = CFM 25 X 100/条件地板面积如果所有管道都不位于条件空间内,则建筑商必须验证室外的置换导管泄漏到室外(PCO)≤8cfm/100 ft 2,后施工总导管泄漏(PCT)≤12cfm/100 ft 2,或安装了2 cfm/100 ft 2的CFM/100 ft 2,或安装了2 cfm/100 ft。状态哪种方法用于进行管道紧身测试:风管鼓风机(DB),改良的鼓风机门减法方法(MBD)或自动多点鼓风机门(AMBD)。
主要关键词