• MW reduction to 1,726MW from 1,904MW due to Non- renewal of Kipevu 1 and the of Muhoroni PPA • Commissioned 172MW Olkaria V geothermal power plant • Joined UNGC and the UNGC BoD • Commissioned 86MW Olkaria I Additional Unit 6 geothermal power plant • Completed full Redemption of KenGen Infrastructure Bond • Takeover of the operation and maintenance of 140MW Kipevu III from Wartsila to KenGen • Commenced geothermal commercial drilling in Ethiopia and Djibouti • Operation and Maintenance contract with REREC for the 50MW Garissa Solar Power Plant • Completed construction of Naivasha Level 5 Outpatient Hospital CSR project • Rehabilitation of Wanjii Power Station