• Signed and Sealed Drawings by NYS licensed design professional (PE/RA) • Shows location of BESS and auxiliary equipment, Hydrant, FDC (if required), and smoke purge activation switch(if required) • Process to shut down system • Rapid Shutdown for solar array as per NEC (NFPA 70) • E‐Stop as per NFPA 79 and 3RCNY 608‐01 (g)(3)(C) •快速关闭开关 + E -Stop的位置•使用软件关闭系统•列出有访问这些系统的人(远程或物理上)•指定任何现有危险•EX。隔离系统不会删除电池中存在的任何电荷。•调试和退役计划•NFPA 855待指导•紧急管理计划•根据FC 608.8
主要关键词