图1卫星图像显示了矿物勘探许可证的方向。......................................................................................................................... 7 Figure 2 A map showing the farms surrounding the mineral exploration licence........ 9 Figure 3 Locality map of the exclusive prospecting licence area .............................. 10 Figure 4 Topographic map showing the existing road network within the licence area..................................................................................................................................... 12 Figure 5 Flowchart of the Environmental Impact Assessment process followed in Namibia...................................................................................................................... 16 Figure 6 A graph showing the temperature patterns in Swakopmund, from www.worldweatheronline.com .................................................................................... 29 Figure 7 A graph showing rainfall patterns in Swakopmund, from www.worldweatheronline.com ....................................................................................... ...............................................................................................................................................................................................................................................................................................................................................................
缩写DEA环境事务部DSR范围范围报告DWNP野生动物和国家公园局EA环境评估EAP环境评估从业人员ECC环境清除证书ECO环境合规官EIA环境影响官员EIA环境影响评估EMA环境管理法(No.2007年7月7日)EMP环境管理计划FLTA灵活土地权限法(2012年第4号法案)FLTS灵活的土地权限系统GHG温室气体HPP2 HARAMBEE HARAMBEE繁荣计划2 kfwkreditanstalstaltaltfürWiederaufbaui&a SM网站经理TEC TOROISE环境顾问
视频生成模型已经证明了产生令人难以置信的单眼视频的功能,但是,3D立体视频的产生仍然不足。我们提出了一种使用现成的单眼视频生成模型的无姿势和无训练方法,用于发电3D立体视频。我们的方法使用估计的视频深度将生成的单眼视频扭曲到立体基线的相机视图中,并采用了一种新型的框架矩阵视频介绍框架。该框架利用视频代理模型来从不同的时间戳和视图中观察到的框架。这种有效的方法会产生一致且具有语义相干的立体视频,而无需场景优化或模型调整。此外,我们开发了一个不合格的边界重新注射方案,该方案通过减轻潜在空间中分离的区域传播的负面影响进一步提高视频介绍的质量。我们通过对包括Sora(Brooks等,2024),Lumiere(Bar-Tal等,2024),Walt(Gupta等,2023)和Zeroscope(Wang等人(Wang et al。,2023A)的视频进行实验来验证我们提出的方法的效率。实验表明我们的方法比以前的方法具有显着改善。项目页面https://daipengwa.github.io/svg_projectpage/
EIA 审查意见,用于建设和运营一条长约 8.4 公里的 132 千伏 (kV) 单回路架空线路 (OHL) 和一条长约 1 公里的地下电缆 (UGC),以将拟议的 Abhainn Dubh 风电场连接到现有的 Fyrish 变电站
专业知识 姓名:JK Amushila 先生 学历:环境管理硕士、农业荣誉学士、农业学士学位、农业国家文凭。 经验:他是 EAPAN 的注册会员(编号 165),曾参与过多个 EIA 和 SEA 项目。Green Gain Consultants cc 已被任命为独立 EAP,负责开展所需的 EIA 研究,并根据《2015 年环境管理法》向相关部门申请 ECC。Green Gain Consultants cc 是一家位于纳米比亚的专业环境和自然资源咨询公司,以对可持续发展的信念、热情和奉献精神为基础。Green Gain 成立于 2012 年,现已发展成为纳米比亚一支庞大的环境从业者团队,为环境挑战提供创新且经济高效的解决方案,并帮助我们的客户满足监管和利益相关者对环境绩效的期望。下表提供了有关 Green Gain Consultants cc 的详细信息。
• 虽然该地区已增设自行车道,但这仍不能满足该地区自行车骑行者的全部需求,尤其是对那些经验不足的骑行者而言,而且完全越野骑行的选择尚未探索。该计划将专门研究探索为这些用户群体提供服务的方案。
表 1:环境影响评估计划详情 ...................................................................................................................................... 8 表 2:土地利用规模 ................................................................................................................................................ 13 表 3:适用的国家法律 ...................................................................................................................................... 19 表 4:重要性评估 ............................................................................................................................................. 22 表 5:颜色编码含义 ............................................................................................................................................. 23 表 6:运营期潜在影响: ............................................................................................................................. 26
Inveroykel 风电场 - 范围界定请求包括建造和运营一个风电场,该风电场由 29 台涡轮机组成,最大叶片尖端高度为 230 米,还有电池储能系统 (BESS) 设施和相关基础设施。
3.1 景观 ................................................................................................................ 10 3.2 视觉 ................................................................................................................ 15 3.3 生态和生物多样性 ................................................................................................ 19 3.4 历史环境 ............................................................................................................ 24 3.5 水环境 ................................................................................................................ 26 3.6 地质和水文地质 ................................................................................................ 29 3.7 农业和土壤 ............................................................................................................. 32 3.8 运输和运动 ............................................................................................................. 35 3.9 空气质量 ................................................................................................................ 38 3.10 噪音和振动 ............................................................................................................. 40 3.11 社会经济、娱乐和旅游 ............................................................................................. 42 3.12 健康和福祉 ............................................................................................................. 46 3.13 气候变化 ............................................................................................................. 49 3.14重大事故与灾难 ................................................................................................ 51 附录 1:正式咨询的咨询机构