List of Figures Figure 1: Patrick Terminals Fremantle ............................................................................................... 4 Figure 2: BEV- TT operations at Patrick Terminals Fremantle ............................................................ 5 Figure 3: PM115 (BEV-TT) undertaking 400A (~260kW) dual gun charging – image 1 ....................... 6 Figure 4: Charger setup including awnings......................................................................................... 6 Figure 5: PM115 (BEV-TT) undertaking 400A (~260kW) dual gun charging – image 2 ....................... 8 Figure 7: Typical 400A Charging Profile ............................................................................................. 9 Figure 3: BEV-TT delivering export containers to a quay crane ........................................................ 10 Figure 9: Typical BEV-TT Driving Profile .......................................................................................... 11
· 制定良好的管理策略。有关更多详细信息,请参阅 BMP 情况说明书概述。· 如果可能,请将废物容器放置在有遮盖的区域,远离雨水渠。· 保护容器免受阳光直射和恶劣天气的影响。· 将容器放在离地面较高的位置(即放在托盘上)并保存在二级容器中。· 现场所有化学品均应有安全数据表 (SDS)。确保在上交废物时将 SDS 提交给危险废物管理计划。· 经常检查储存容器是否有泄漏或腐蚀迹象。· 确保所有废物储存容器都贴有标签并且盖子盖紧。· 不要用冲洗水或容器未打算储存的任何其他液体填充容器。· 定期清扫和清洁储存区域。如果是铺砌表面,请勿用水管将区域冲洗到雨水渠中。· 仅在当地下水道管理部门允许的情况下,才将清洁容器中的冲洗水排入下水道。请提前与饮用水/废水项目经理协调此事,以获得授权,电话:(703) 806 - 0137。· 请勿混合废物!这会导致无法回收、处理复杂化并引起有害化学反应。· 作为临时安排,将材料放在铺好的表面上,用防水布或塑料布覆盖,并用重物或绳索固定。确保有液体的二级容器。
根据 DODM 4140.27 V2:所有容器均需重新标记保质期延长通知。单元容器和中间容器在从外部容器中取出后需要重新标记。
根据 DODM 4140.27 V2:所有容器都需要重新标记保质期延长通知。单元容器和中间容器在从外部容器中取出后需要重新标记。
23/305 Highfield Storage Operations Limited E 29/11/2023 the construction of an energy storage facility within a total site of up to 0.86 hA, to include one single storey electrical substation building and electrical compound, electrical transformer/inverter station modules, containerised battery storage modules and spare parts containers on concrete support structures, access tracks, associated electrical ducting, cable racking and cabling, security fencing and CCTV安全监控系统,避雷针,通信设备和辅助基础设施先前的Ref 18600406 Ballyglasheen Kilfeakle Co. Tipperary
• • Positive electrode - tubular plate with lead-tin-calcium alloy • • Negative electrode - flat plate with lead- calcium alloy grid • • Separator - low resistance microporous material • • ABS containers and lids with high resistance to shocks and vibrations (UL94 V-0 rated flame retardant ABS available as an option) • • Electrolyte - sulphuric acid, immobilised as a gel • • Proven, high完整性支柱密封设计以防止电解质泄漏••终端设计-M10端子带有黄铜插入物件••压力释放阀 - 带有整体火焰捕捉器的单向阀增加了操作安全性
• • Positive electrode - tubular plate with lead-tin-calcium alloy • • Negative electrode - flat plate with lead- calcium alloy grid • • Separator - low resistance microporous material • • ABS containers and lids with high resistance to shocks and vibrations (UL94 V-0 rated flame retardant ABS available as an option) • • Electrolyte - sulphuric acid, immobilised as a gel • • Proven, high完整性支柱密封设计以防止电解质泄漏••终端设计-M10端子带有黄铜插入物件••压力释放阀 - 带有整体火焰捕捉器的单向阀增加了操作安全性
•我们的工具,包括用于批量RNASEQ分析的Docker4Seq和用于单细胞RNASEQ分析的RCASC,利用Docker容器来高效,可扩展和可再现的工作流程。•个性化的Docker容器: