1。The National Grid Corporation of the Philippines (NGCP) and Universal Power Solutions, Inc. (UPSI) are GRANTED provisional authority to implement their Ancillary Services Procurement Agreement (ASPA) for the 50.519 MW/50.519 MWh rated capacity Battery Energy Storage System Power Plant located in Alangan, Limay, Bataan (Bataan BESS), subject to the following rates and conditions, and without prejudice to the根据能源部(DOE)部门通函编号DC2021-10-0031 1(DOE 2021 AS-CSP循环):1.1适用率:UPSI应为NGCP的调节储备(RR)容量收取适用的费率(以每小千瓦的容量为单位),如ASPA的附表3。ASPA附表1中指示的AS容量是小时的企业容量。适用的费率应如下:无需派遣能量的NGCP的预定容量应支付该预定容量的适用税率,而AS证书中指示的RR的指定容量不应超过以下费率的RR的指示能力: