Loading...
机构名称:
¥ 2.0

planer (e.g., around gullies), • Loader/excavator used to collect and move excess material, • Sweeper to collect loose material and provide clean laying surface, • Milled out/excavated materials all taken off site, • Tack/bond coat laid, • Binder material laid and compressed by paver (where required), • Material compacted using a heavy roller, • New bituminous surface course material laid by paver, • Material compacted using a heavy滚筒,•机械清扫器以收集松动的材料,•HGV以拆除和更换材料,•必要时使用路标和螺柱,•拆除TM和开放路。

确定的环境影响评估记录

确定的环境影响评估记录PDF文件第1页

确定的环境影响评估记录PDF文件第2页

确定的环境影响评估记录PDF文件第3页

确定的环境影响评估记录PDF文件第4页

确定的环境影响评估记录PDF文件第5页