6参见第1段。3.20 to 3.28 of RIIO-2 Final Determinations - NGET Annex REVISED https://www.ofgem.gov.uk/sites/default/files/docs/2021/02/final_determination_nget_a nnex_revised.pdf 7 We also note that NGET's contracting strategy for the tunnel/cable work package was to use a NEC4 Option C type合同以确保将有足够的招标活动参与,以带来竞争成果。NEC4工程和施工合同选项C是目标成本合同,其活动时间表在客户和承包商之间共享投资经济风险。