(2)尽管以为第(1)条,但在R2区域中土地细分的细分可能会批准,如果(a)分区会导致每个居住在每个居住的地方,则竖立双重居住在单独的批次上,或者(b)在勃起的工作中,或者均置于(b)的竖立工作,或者是勃起的工作,或者是勃起,或者勃起,该划分会导致每一个居住,或者勃起,或者勃起,或者要竖立双重居住,或者提议竖立双重居住。 16 June 2022, and (c) the erection was, or is being carried out, under a development consent granted before 16 June 2022, and (d) the consent authority is satisfied— (i) the dual occupancy was originally intended to consist of 2 dwellings to be separately occupied, and (ii) the resulting lots substantially correspond to the intended 2 separately occupied dwellings, and (e) each resulting lot is not less than 375m 2 .