Loading...
机构名称:
¥ 1.0

i) Recommend on the method of power evacuation and the necessary agreement required with concerned utilities/PGCB. Identify key issues and provide solutions/ recommendations for grid stability to the utility to accommodate and integrate the solar power generated from the proposed plants. Identify additional investments and its cost estimates required for successful integration of the solar project. Study the existing power system and identify gaps, load centers to ensure that the renewable energy generated is fully utilized without any curtailment. Conduct Network Modelling, Electrical connection specification, Load Flow Analysis, Contingency Analysis, Short Circuit Study, etc as required by PGCB. ii) Preparation of overall plot plan, Conceptual Design, and Single line diagram (for the options A and B and block layouts for solar power generation plant, BESS, Electrical transmission network and other applicable facilities including all Mechanical, Electrical, Civil, Protection, Control & Instrumentation systems, testing facilities, SCADA, considering safety distance for each facility and emergency response planning etc.

职权范围

职权范围PDF文件第1页

职权范围PDF文件第2页

职权范围PDF文件第3页

职权范围PDF文件第4页

职权范围PDF文件第5页

相关文件推荐

2024 年
¥1.0
2024 年
¥1.0
2024 年
¥1.0
2025 年
¥1.0
2024 年
¥2.0
2024 年
¥1.0
2024 年
¥1.0
2017 年
¥1.0
2024 年
¥1.0
2024 年
¥2.0
1900 年
¥1.0
2024 年
¥1.0
2025 年
¥1.0
2024 年
¥1.0
2024 年
¥2.0
2024 年
¥1.0
2022 年
¥1.0
2024 年
¥1.0
2025 年
¥1.0
2023 年
¥1.0
2024 年
¥1.0
2024 年
¥1.0
2024 年
¥1.0
2023 年
¥1.0
2024 年
¥1.0
2025 年
¥1.0
2024 年
¥1.0
2025 年
¥1.0
2024 年
¥2.0