‣重新访问2017年Bechtel/WSI成本研究,对四个alpha概念(脉冲,中间密度)‣基于E. Ingersoll等人的新反应堆 - 稳定范式的更新工厂成本(BOP)成本核算方法。‣ Public summary report plus four proprietary reports to the four ALPHA PIs ‣ Modular design/construction can significantly shorten construction times and lower indirect (interest) costs ‣ Cost savings realized by centralized manufacturing and shipping complete subsystems ‣ Total capital cost are approximately half of those from the 2017 study ‣ For 400-MWe power plant, average capex of $800M and $2/W, average LCOE = 47 $/MWh (34-54 $/MWH的范围)

ARPA-E更新和融合“能力团队”的概述