DOD的ESTCP演示项目描述/目标虽然高效,并且在世界范围内使用,但在美国,GHP在美国不存在。This project will Demonstrate two viable GHP-USTES architectures that: • Reduce installed cost 20% below conventional/full GHPs • Reduce HVAC energy cost at least 30% below conventional HVAC and at least 10% below full Geo • Have no on-site emissions, 80%-100% less cooling water consumption, 40% smaller carbon footprint • Provide Bases a truly sustainable infrastructure “inside the fence” (aka Energy Security)
主要关键词