WACO市区实施计划是针对行动的策略,用于实施韦科市中心的改进。改进将寻求将街道转变为为所有居住,工作和参观Waco市区的人提供一个更舒适和愉快的空间。在此分析中研究的特定公众改进包括评估街景,行人流动性和停车位。To help inform the Downtown Implementation Plan, the following previous plans and studies were reviewed: The City Plan: Waco Comprehensive Plan, Waco Metro Area Active Transportation Plan (2019), 2014 Waco Downtown Transportation Study, Waco Rapid Transit Corridor Feasibility Study (2018), Waco Metropolitan Trail System (2021), and Imagine Waco: Downtown Masterplan (2010).
主要关键词